My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-11-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
07-11-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
9/9/2025 11:01:07 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
7/11/1988
Retention Effective Date
9/9/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of OR()NO <br />RESOWTION OF THE CITY COUNCIL <br />NO. <br />1. Prior to the hauling of fill to the site the applicant or <br />applicant's agent must submit the following: <br />a) Six cross sections of existing topography. <br />b) Final grading and Erosion Control plan designating the <br />following: <br />1) Side slopes 5:1. <br />2) One percent slope to be maintained within inner Fill <br />area. <br />3) ;gilt fence installed 30 to 35 feet from wetland at <br />972 elevation - no land alterations allowed within 26 <br />feet of wetland. <br />4) Average height of fill to be maintained at 5 feet. <br />5) Monitoring plates to be installed as required by <br />the City Engineer. <br />c) Executed Developer's Agreement and appropriate secur4_ty <br />to insure final grading and seeding if fill project is not <br />completed. Letter of Credit mustbe written for 150 percent <br />of the estimated cost of the improvement. <br />2. Fill shall not exceed allowed amount of 100,000 cubic yards. <br />Side slopes shall be seeded as soon as 5:1 slope ratio has been <br />realized. <br />3. Park Construction shall be responsible for advising the City <br />of monthly schedule of hauling activities so that staff can <br />arrange an approximate inspection schedule for each month. Prior <br />to hauling any fill to the site Park Construction must arrange <br />for a preconstruction meeting with the Orono staff to review all <br />final submittals and tentative hauling schedule. <br />4. Park Construction shall cease all hauling to the site upon <br />evidence of shearing and/or other signs of instability created by <br />filling over the former dump site. Applicant shall not proceed <br />with hauling until the City Engineer has had adequate time to <br />review the evidence and submit a written report to t.,e Council <br />for their review and action. If Council determines that it is in <br />the public interest to cease all hauling to the site, this <br />conditional use permit shall be terminated immedia-ely and the <br />applicant shall complete the final qrading and seeding of the <br />entire disturbed area. <br />5. Authoritieb granted by this resolution run with the prooerty <br />not with the owner, 'out are permissive only and must be completed <br />within one year of the date of Council approval or the special <br />conditions of this resolution will expire on that date (June 8, <br />1988). <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.