My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet Cc - regular meeting 7/11/1988
Orono
>
City Council
>
1988
>
Agenda Packet Cc - regular meeting 7/11/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:47 AM
Creation date
9/9/2025 11:01:07 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
7/11/1988
Retention Effective Date
9/9/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COURCIL MEETING HELD JUNE 27, 1988 <br />#1288 WARD EDWARDS* <br />2474 CARMAN STREET <br />RENEWAL VARIANCE <br />RESOLUTION #2462 <br />It was moved by Councilmember Sime, seconded by <br />Councilmember Goetten, to adopt Resolution i2462 <br />approving the renewal variances as proposed. Motion, <br />Ayers 4, Nays 0. <br />11297 MASHINGTON SCIENTIFIC INDUSTRIES, INC. <br />CONNERCIAL SITE PLAN REVIEW <br />Joe Pallansch a►►d architect, Ed Vogt, were present for <br />this matter. <br />City Administrator Bernhardson explained the commercial <br />site plan review F^r a proposed addition to the <br />northwest side of the existing structure. He noted the <br />possible need to vacate a portion of the Lincoln Drive <br />platted right-of-way. He stated a major concern of <br />staff's is the need to commit to a future rear frontage <br />road for safe access. <br />Building & Fire Inspector Jacobs explained the request <br />to allow stock piled fill from the proposed addition <br />excavation on the property until proper approvalts are <br />granted from the City to fill a low area on the <br />property. <br />Acting Mayor Callahan felt t at the location of the <br />future frontage road directly affected the entire lot <br />and therefore, questioned if the road location should be <br />determined before approving the commercial site plan. <br />Mr. Pallansch felt that t. proposed additior and <br />frontage road were two separate issues, however, W.S.I. <br />will be sending a letter to the City indicating their <br />willingness of cooperation for an access road. <br />City Administrator Bernhardson recommended approvul of <br />the commercial site plan at this point, and staff will <br />work with W.S.I. on an access road. <br />Mr. Pallansch noted that the access issue will involve <br />many long meetings with seveial different groups to <br />determine. <br />It was moved by Actinq Mayor Callahan, anconded by <br />Counci:member Sime, to approve the commercial site plan <br />and stock pi 1 ing of f 111 per staff recommendation. <br />Motion, Ayes 4, Nays 0. <br />z <br />
The URL can be used to link to this page
Your browser does not support the video tag.