Laserfiche WebLink
Additional Cos ents and Planning Cos ission Recos endation <br />Exhibit I - Staff Inspection Report <br />Planning Commision advised the applicant that the structure would have <br />to be altered because they could not approve the encroachment of the <br />structure over the rear lot line. The Escher advised that the existing <br />structure could be altered approximately 21. Escher advised the Planning <br />commisisen that the structure could be altered at least 2' based on the <br />location of the foundation pier. Planning Commission then approved a 1'6" <br />setback from the rear lot line requiring the 816" variance setback for the <br />total structure. Subject to the required installation a fire wall along <br />the rear lot line for being constructed within the structure. <br />Staff asked the Building Staff to go out and confirm the width of the <br />maximum alteration allowed based on the location of the pier footing. Staff <br />confirmed that it could only be altered 1'6". Approving a 116" alteration <br />of the structure would require now a 9' variance or 90% rear setback <br />variance. Staff has reviewed below the various alternatives of action <br />available to the Council. <br />1. Approval of Planning Commission recommendation - subject to staff <br />confirmation based on minimal alteration required to retain the pier <br />foundation. <br />Required = 10' <br />Proposed - l' <br />Variance = 9' or 90% <br />2, Alter structure to meet a minimum 3' setback requiring alteration <br />of the existing Fier footing. Structure would now be 416" in width. <br />Required - 10' <br />Proposed - 3' <br />Variance = 7' or 70%. <br />Applicants may not find a shed with 4 1/2' width satisfactory for the <br />proposed use. It should also be noted that the fir, wall would be <br />required along the side of the structure that abuts tte rear lot line <br />(fire wall required for structure legs than 5' from a lot line). <br />3. To recommend denial of a rear setback variance for an attached <br />storage shed to the existing garage structure and to recommend that <br />storage shed addition be attached to garage along the west side <br />.neeting the required 10' setback from the roar lot line. Applicant <br />may wish to construct a dettached shed that may be placed 5' from the <br />rear lot line and 10' from the side lot line. The required rear <br />setbacks are met there is no need to construct a fire wall a for 4 the <br />rear of the new structure. <br />Council Action <br />To give staff conceptual direction so that the ap, ropriate resolution <br />can be drafted for action at the July 11, 1988 Council meeting. <br />