My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-09-2025 - Agenda Packet Park Commission - Special Meeting
Orono
>
Park Commission
>
2025
>
09-09-2025 - Agenda Packet Park Commission - Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:40 AM
Creation date
9/5/2025 4:49:19 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Park Commission
Section
Park Commission
Subject
Special Meeting
Document Date
9/9/2025
Retention Effective Date
9/9/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BOLTON <br />tiF <br />O & MENK <br />(�1CtiHV0.t <br />Executive Summary <br />December 2023 <br />Overview <br />Orono, Minnesota <br />Existing features: <br />Hackberry Park is a 3 acre neighborhood park located at the northwest corner of Willow Drive North and Maple Lane. The <br />block containing the existing park also includes one single-family home. This house was purchased by the City of Orono in <br />2016 using life estate and the City of Orono assumed ownership of the property when it was vacated in December 2022. <br />The removal of the house allows Orono to design a master plan for Hackberry Park that better meets meets the needs of <br />the commmnity. The main existing features include the following: <br />• Ball fields Chemical toilets Playground equipment <br />• Basketball court Open space Mature Trees <br />• Benches Picnic tables Park sign <br />• Bike Racks Open space Resident mailboxes <br />Process <br />In April 2023, the City of Orono enlisted the services of Bolton & Menk to help guide the City through a formal master <br />planning process of Hackberry Park. The master planning process was a coordinated effort between the Orono Park <br />Commission, City staff, and Hackberry Park's neighborhood residents. From April through August a series of public <br />listening sessions were held by City staff to inform the design and programming of the park. Updates and draft concepts <br />were shared with the Hackberry Park sub -committee and the larger Park Commission. Orono City Council approved <br />staff's recommendation to move into a preliminary design phase on Monday, August 28, 2023. The item was approved <br />in a 4-1 vote. Feedback at the final listening session on August 30th did not direct additional changes to the draft design, <br />allowing the plan to be finalized. Master plan recommendations are documented in the pages that follow. <br />6* Resident Input <br />r <br />April 4: Master LSession <br />May 9: July 20: City staff August 7: Draft August 28: August 30: <br />Plan design Listening provided plan update concept shared Concept Listening Master Plan <br />services begin 1 Session #2 to Hackberry Park with Park approved by Session #3 Complete <br />sub -committee Commission City Council <br />4oN� <br />y. Orono City Staff & Council Approval <br />KFCNO <br />F7I <br />
The URL can be used to link to this page
Your browser does not support the video tag.