Laserfiche WebLink
Date: January 27, 2025 <br />To: Wallace Architecture, PLLC <br />311 Third St. <br />Excelsior, MN 55331 <br />Attn: Dan Wallace, Architect <br />From: <br />Eric Bunkers <br />Project: <br />Garrett Residence <br />650 N. Brown Rd. <br />Long Lake, MN 55356 <br />Proj. No: <br />25009 <br />Subject: <br />Proposed Remodeling <br />Dear Dan: <br />Bunkers & Associates LLC <br />structural engineers <br />6687 Forest Street <br />Farmington, MN 55024 <br />651.366.2853 <br />As requested, we designed new structural members for the above referenced project. We have designed the <br />new members using a roof and floor dead load of 15 psf, a roof snow load of 35 psf, a floor live load of 40 psf <br />and a 115 mph Ultimate Design wind speed in accordance with the Minnesota State Building Code. Wind <br />shear walls have been designed using IRC R301.1.3. Our work only includes designing the new members <br />as shown at the above reference project and is based on drawings provided by you and from our <br />conversations. <br />We reviewed structural sheets 04, 06 and 08 based on annotated framing and foundation notes we <br />previously sent showing the new members and connections. All framing and foundations shall be shored <br />and temporarily braced as required by the contractor and all minimum nailing shall be in accordance with <br />IRC Table R602.3(1). Lumber shall be minimum #2 SPF with treated lumber to be #2 S. Pine and <br />engineered lumber to have Fb = 2850 psi with E = 2.0. Our calculations assume all lumber is of good quality <br />and does not have large splits and checks and shall be visually inspected by the contractor at the time of <br />construction. All fasteners in contact with treated lumber shall be G185 hot dipped galvanized or equal. <br />Rebar shall be grade 60. <br />Concrete used for footings shall have a 28 day compressive strength of 5000 psi. The new footings have <br />been designed as typical spread footings based on a presumptive load -bearing value of 2000 psf in <br />accordance with Table R401.4.1 of the IRC. Presumptive soil bearing value shall be verified by a <br />geotechnical engineer where required by the building official per R401.4. The existing footings have been <br />assumed to be typical spread footings on good soils that are assumed to be performing adequately. The <br />contractor shall also verify the condition of structural members and foundations affected by the remodeling. <br />Exterior grade shall slope away from the building and gutters with long downspouts should be used <br />whenever possible. New finish cracks in existing walls and ceilings are likely and common in remodel <br />construction. <br />When installed as indicated above, the new framing members and new foundation shown on the reviewed <br />sheets shall support the loads as required in accordance with the Minnesota State Building Code. If you <br />have any questions or concerns, please feel free to contact us. <br />Sincerely, <br />Bunkers and Associates, LLC <br />Eric M. Bunkers, P.E. <br />MN Reg. Num. 26490 <br />I hereby certify that this plan, specification, or report <br />was prepared by me or under my direct supervision <br />and that I am a duly Licensed Professional Engineer <br />under the laws of the state of Minnesota. <br />Eric M. Bunkers <br />Date: January 27, 2025 Reg. No. 26490 <br />wallace <br />ARCHITECTURE, PLLC <br />311 Third Street <br />Excelsior, MN 55331 <br />952.913.9641 <br />These documents are instruments of <br />service, and, as such, remain the <br />property of wallace ARCHITECTURE, <br />pllc. Use or publication of these <br />documents requires written approval <br />from wallace ARCHITECTURE, pllc. <br />Q0 <br />_0 <br />Ili <br />� <br />M <br />O <br />O <br />IO <br />LO <br />� <br />Q <br />Z <br />Q <br />+ <br />c: <br />m <br />O <br />_ <br />'}' <br />Z <br />J <br />+-' <br />-a <br />O <br />0 <br />L <br />C9 <br />O <br />J <br />Project Number: <br />2410 <br />Project Architect: <br />Dan Wallace <br />Drawn By: <br />Dan Wallace <br />Date of Issue: <br />BIDA - 25 Jan 2025 <br />21 Jan 2025 <br />DD.1 - 18 Dec 2024 <br />SD.1 - 12 Dec 2024 <br />00 <br />78 <br />