My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-08-2025 - Agenda Packet City Council - Regular Meeting
Orono
>
City Council
>
2025
>
09-08-2025 - Agenda Packet City Council - Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:56:59 AM
Creation date
9/5/2025 4:33:50 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
Regular Meeting
Document Date
9/8/2025
Retention Effective Date
9/8/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES: <br />01 . PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY FOR THE COMPLETE INSTALLATION OF THE <br />ELECTRICAL SYSTEM, INCLUDING POWER, WIRING, AND LIGHTING AS SHOWN ON THE DRAWINGS AND AS <br />REQUIRED ON SITE. <br />02. REVIEW LAYOUT OF ALL LIGHTING, SWITCHES, RECEPTACLES, AND ANY OTHER ROUGH -IN BOXES WITH THE <br />OWNER PRIOR TO THE START OF WORK. DO NOT SCALE DRAWINGS FOR THE LOCATIONS OF ELECTRICAL <br />DEVICES. <br />03. COORDINATE WIRING AND FIXTURE PLACEMENT WITH FRAMING, STRUCTURAL FRAMING, PLUMBING SYSTEM, <br />MECHANICAL SYSTEM, AND EXISTING ELECTRICAL SYSTEM PRIOR TO ROUGH -IN. DO NOT CUT OR ALTER ANY <br />STRUCTURAL ELEMENTS WITHOUT WRITTEN APPROVAL FROM THE ARCHITECT. <br />04. COORDINATE ROUGH -IN BOX LOCATION WITH SPECIFIC LIGHT SELECTED FOR THAT LOCATION PRIOR TO <br />INSTALLATION. <br />05. THERE IS TO BE AT LEAST ONE (1) INCH CLEARANCE BETWEEN THE FINISHED ELECTRICAL COVER PLATE AND <br />ANY ADJACENT SURFACE OR TRIM UNLESS OTHERWISE NOTED. <br />06. PROVIDE SMOKE DETECTORS AND CARBON MONOXIDE DETECTORS PER CODE. REVIEW LOCATIONS WITH THE <br />ARCHITECT PRIOR TO INSTALLATION. <br />07. PROVIDE ELECTRICAL HOOK-UPS AS REQUIRED ON THE LOWER LEVEL FOR ANY OTHER MISCELLANEOUS <br />EQUIPMENT SPECIFIED BY OWNER. <br />08. REVIEW TELEVISION, INTERNET, AND ANY OTHER MISCELLANEOUS WIRING REQUIREMENTS WITH OWNER PRIOR TO <br />CONSTRUCTION. REVIEW LOCATIONS WITH THE ARCHITECT PRIOR TO INSTALLATION. <br />09. ALL DECORATIVE LIGHT FIXTURES TO BE PROVIDED BY OWNER. <br />10. PROVIDE GFCI PROTECTED OUTLETS AS REQUIRED. <br />1 1 . FIELD VERIFY WITH OWNER ANY ADDITIONAL EXTERIOR LIGHTING REQUIREMENTS. <br />aLU <br />z 0 <br />ELECTRICAL KEY <br />z0 <br />oz <br />DUPLEX RECEPTACLE <br />oN <br />J CL <br />SINGLE POLE SWITCH <br />WALL FIXTURE <br />LED STRIP LIGHT <br />® 4" RECESSED CAN LIGHT <br />4!) VENTILATION FAN <br />PLAN - lower level electrical <br />SCALE:1/4" = V-0" <br />Wallace <br />ARCHITECTURE, PLLC <br />311 Third Street <br />Excelsior, MN 55331 <br />952.913.9641 <br />These documents are instruments of <br />service, and, as such, remain the <br />property of wallace ARCHITECTURE, <br />pllc. Use or publication of these <br />documents requires written approval <br />from wallace ARCHITECTURE, pllc. <br />Q0 <br />� <br />Q <br />� <br />O <br />Q) <br />+ <br />_0 <br />� <br />O <br />Cr <br />� <br />O0 <br />LO <br />M <br />LO <br />Lo <br />Z <br />Ur <br />N <br />C: <br />O <br />m <br />Z <br />+-' <br />-0 <br />p <br />L <br />O <br />J <br />Project Number: <br />2410 <br />Project Architect: <br />Dan Wallace <br />Drawn By: <br />Dan Wallace <br />Date of Issue: <br />BID.1 - 25 Jan 2025 <br />21 Jan 2025 <br />DDA - 18 Dec 2024 <br />SD.1 - 12 Dec 2024 <br />10 <br />75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.