My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinances 1st series - 150
Orono
>
Ordinances
>
Ord 1s and 2nd Series (historical)
>
Ordinances 1st Series (1-150 Microfiche)
>
Ordinances 1st Series 150 - 253
>
Ordinances 1st series - 150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2015 2:51:32 PM
Creation date
9/4/2025 3:21:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 I <br /> ^• • L� <br /> , , , ORNAMENTAL STREET LIGHTING SERVICE (Contd) <br /> ' (CUSTOMER �INID EQUIP'MENT) <br /> Group I (Contd) <br /> Number of Daily Monthly <br /> Lamps per Operating Rate per <br /> Designation of Lamps I�uminaire Schedule Luminaire <br /> F72H0 - Fluorescent 4 AN $ 3.50 <br /> F72H0 - " 4 2AN-2I�II�T 3.25 <br /> F72H0 - " 4 NIId 3.00(1) <br /> F72EH0 - " 1 AN 2.25(1) <br /> F72EH0 - " 2 AN 3.25 <br /> F72EH0 - " 2 MN 2.75(1) <br /> F72EH0 - " 4 AN 6.00 <br /> F72EH0 - " 4 2AN-2MN 5.50 <br /> (1) Available to existing installations only. <br /> Where more than one of the above luminaires is mounted on a single standard, the <br /> monthly rate for each luminaire in excess of one shall be reduced by 25� (except <br /> as modified in Service Included in Rate - Group I paragraph) . <br /> Group II (For installations consisting of standards which do not require painting <br /> and globes which are unbreakable) <br /> 175 Watt - Mercury 1 AN $ 1.75 <br /> 250 " " 1 AN 2.25 <br /> 400 " " 1 AN 3.00 <br /> Service Included In Rate <br /> Group I <br /> Company shall furnish all electric energy necessary to operate Customer's Orna- <br /> mental Street Lighting system, shall make all lamp and globe renewals, clean the <br /> globes, light and extinguish all lamps, paint the metal portions of the standards <br /> and furnish all the materials and labor necessary therefor. <br /> At Customer's option Company shall make all ballast renewals in lieu of painting <br /> the standards; in which case the 25� per luminaire reduction for more than one <br /> luminaire per standard, as provided for under the above Rate, shall not apply. <br /> Group II <br /> Company shall furnish all electric energy necessary to operate Customer's Orna- <br /> mental Street Lighting system, shall make all lamp renewals, clean the globes, <br /> light and extinguish all lamps and furnish all the materials and labor necessary <br /> therefor. <br /> Daily Operating Schedule The daily operating schedule of the above lamps on the <br /> All-night (AN) schedule shall be from approximately one-half hour after sunset <br /> until one-half hour before sunrise, and on the Midnight (rIl�i) schedule shall be <br /> from approximately one-half hour after sunset until midnight (Central Standard <br /> Time.) <br /> . Outages If illumination from any lamp is interrupted and said illumination is <br /> not resuured wi.thin 24 hours from the time Company receives notice thereof <br /> from Customer, 1/30 of the monthly rate for such lamp shall be deducted for <br /> each night of non-illumination after such notice is received. <br /> AA <br />
The URL can be used to link to this page
Your browser does not support the video tag.