My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinances 1st series - 150
Orono
>
Ordinances
>
Ord 1s and 2nd Series (historical)
>
Ordinances 1st Series (1-150 Microfiche)
>
Ordinances 1st Series 150 - 253
>
Ordinances 1st series - 150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2015 2:51:32 PM
Creation date
9/4/2025 3:21:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br /> . . <br /> 17 <br /> LARGE CONIlKERCIAL SERVICE (Contd) <br /> Determination of Demand The demand in kilowatts for billing purposes shall be <br /> the greatest 15-minute coincident load (subject to power factor adjustment) <br /> during the month for which bill is rendered, but in no event shall the demand <br /> to be billed be considered as less than 50�0 of the greatest demand billed <br /> during the preceding eleven months, nor less than 3 kw for Service at Secondary <br /> Voltage and 25 kw for Service at Primary Distribution Voltage. <br /> Minimum Demand to be Bi•lled The monthly demand charge shall not be less <br /> than provided above, whether or not energy is used. <br /> Power Factor The custarner shall at all times take and use power in such manner <br /> that the average power factor shall be as neax 100°fo as possible, but when the <br /> average power factor is less than 80�0, then the demand as determined above shall <br /> be adjusted by multiplying it by 80°fo and dividing the product thus obtained by <br /> the average power factor expressed in percent. <br /> The average power factor is defined to be the quotient obtained by dividing <br /> the kilowatt-hours used during the month by the square root of the sum of the <br /> squares of the kilowatt-hours used and the la�ging reactive kilovolt-ampere- <br /> hours supplied during the same period. Ar�y leading kilovolt-ampere-hours <br /> supplied during the period will not be considered in determining the average <br /> power factor. <br /> Where customer's demand is less than �+0 kw the average power factor may at <br /> the Company's option be determined by periodic test or measurement. <br /> Standby, Supplementary, F�nergency and Incidental Service <br /> (Alternating Current Only) <br /> Availability Available for service to cust�ers who normally supply their <br /> requirements either directly or indirectly from another independent source <br /> of power for which the Company's service may be substituted wholly or in <br /> part. Customer shall contract for capacity adequate to supply the entire <br /> electrical requirements for which such service may be used and Company <br /> shall not be obligated to supply capacity in excess of the amount con- <br /> tracted for by eust�er. <br /> Rate The billing shall be in accordance with the Large Commercial Service <br /> rate schedule, except that the paragraph "Determination of Demand" shall <br /> be modified to read as follows: "The demand in kilowatts shall be the <br /> greatest 15-minute load during the month for which bill is rendered, but <br /> in no month shall the demand to be billed be based on less than the greatest <br /> demand previously supplied nor on less than the demand contracted for. In <br /> addition, for new customers taking service subsequent to January l, 1.965, the <br /> demand to be billed shall in no event be considered as less than 100 kw." <br /> AA <br />
The URL can be used to link to this page
Your browser does not support the video tag.