Laserfiche WebLink
� <br /> F <br /> � Cit� o� ORONO <br /> • . <br /> � RESOLUTION OF THE CITY COUNCIL . <br /> � NO. 1386 <br /> � • � • • <br /> NOW, THEREFORE, BE IT RESOLVED that the City Council of the <br /> City of Orono hereby approves the setback variance of David J. Delanev . <br /> to permit the construction of a canopy structure in conjunction with the <br /> installation of dual remote lanes for the First National Bank of Navarre <br /> based on one or more of the following findings of fact: <br /> 1) The property is located within both the B-3 and B-4 <br />- commercial zoning districts. The total area of the <br /> property is approximately 25, 000 sf; the predominant <br /> zoning district, B-4, requires 20, 000 sf of area. <br /> • The property is 100 ' wide; the B-4 zoning district � <br /> requires 100 ' of width. <br /> 2) The bank has operated from this site since 1964 . <br /> 3) The applicant proposes installing a second remote <br /> lane adjacent to the existing one on the south side <br /> ' • of the existing structure. In conjunction with the <br /> installation of the second remote lane, a canopy <br /> structure will be erected that will extend 15. 5 ' <br /> from the bank structure and 3. 5 ' from the side lot <br /> line. <br /> 4) The proposed canopy structure will require a side <br /> setback variance .as follows: <br /> B-4 Commercial Zoning District , • <br /> requires 15 ' side setback � � <br /> existing 16. 9 ' - at rear SW corner of bank <br /> proposed 3.5 � <br /> variance 11.5 or 760 <br /> 5) The installation of. the second remote lane will also <br /> necessitate relocating sections of the existing retaining <br /> wall and rebuilding one along the south property line. <br /> 6) Dr. Paul Englund�, property owner to the south, has <br /> submitted a l.etter dated April 2, 1982, giving his <br /> consent to the construction of such a retaining wall, <br /> portions of which may extend over the shared lot line. <br /> • . <br /> Page 2 of 5 <br />