My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980-11-25 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Devin Lane
>
2375 Devin Lane - 03-117-23-22-0020
>
Septic
>
1980-11-25 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 3:21:10 PM
Creation date
9/3/2025 3:17:31 PM
Metadata
Fields
Template:
x Address Old
House Number
2375
Street Name
Devin
Street Type
Lane
Address
2375 Devin Lane
PIN
0311723220020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE YVALUATION REPORT <br />FOR REDFI-MD HOM 3S 7S "�`�'�►�- <br />LOT 10, THS NURSERY <br />9-10-80 <br />On September 6, 1980 six percolation holes Were tested and three <br />soil borings taken, the primary site was comprised of holes 1-4 Which <br />were located -west of the proposed house. Holes 5 and 6 were in the al- <br />ternate site on the south side if the lot. All the percolation holes <br />were dug 6 inches in diameter to a 42 inch depth while the soil bor- <br />ings were dug 6 inches in diameter to the 4 foot depth and 3 inches <br />In diameter to the remaining depth. All holes were dug with bucket <br />type band augers, <br />Water was kept in the holes the night prior to testing after <br />which the holes were tested in �j hour intervals for 4-.-hours. The av- <br />erage percolation rate for the primary site was 16.6 minutes per inch. <br />which would be acceptable for a standard drainfield system. However, <br />with a high water table in wet seasons possible in this area, the <br />trenches should be kept fairly shallow. Very good material was en- <br />countered on the alternate site which could aeowt a standard system <br />a2ss. <br />Beeausse-the primary site should be no nearer than 75 feet to the <br />small low area to the weet., and iha elevation drop it about 7 feet from <br />the top of the hill to the drainfield area, the hovsw might have to <br />be rafaUd slightly to obtain a walkout to the. drainfield sftbe-this <br />area (dsainfteld 21#4 can not be graded. <br />Additional design information follows. Lf any questions arise or <br />other information is needed, please contact me. <br />sincerely, <br />?3RCOR, INC. <br />A1 <br />Mark 3, Gronberg, P.B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.