My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-08-24 On Site Sewage Treatment Inspection Report
Orono
>
Property Files
>
Street Address
>
D
>
Devin Lane
>
2315 Devin Lane - 03-117-23-22-0019
>
Septic
>
1987-08-24 On Site Sewage Treatment Inspection Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 12:14:48 PM
Creation date
9/3/2025 12:13:14 PM
Metadata
Fields
Template:
x Address Old
House Number
2315
Street Name
Devin
Street Type
Lane
Address
2315 Devin Lane
PIN
0311723220019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
On Me Nordb Shore of <br />Lake Minnetonka <br />ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER __T IV) ,yta `? Y-It• ItIvch bit, ADDRESS <br />PERMIT NO.'S. r� � -- DATES CONTRACTORS 01 o J-r' dill 00. <br />City Ordinance No. 210 requires that each on -site sewage treatment system in Orono be inspected on a regular basis. The on -site sewage <br />treatment system at the above address has been inspected and appears to fall into the category checked below. <br />(This is ;!flan existing system ❑ new construction) <br />01 Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears to be operating <br />properly. <br />El 2 Does not meet all current City standards for new construction 11978 Code) but in most respects appears to be designed. <br />located, and constructed generally in accordance with p.evrous codes. System appears to be functioning properly; no major <br />upgrading of the system is required at this time. <br />El 3 Does not meet current City standards in many respects relating to design, construction, or location. Appears to be operating <br />adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is required at <br />this time. <br />4 System may or may not meet current City standards for design, construction or location, but is failing to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwaters, or is <br />creating a safety hazard, or is otherwise creating a public nuisance. Please contact the City Inspector to discuss system repair/ <br />replacement procedures. If drainheld replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION ( m Citecked items may require your action) <br />Tank inspection indicates: <br />Pumpout not needed at this time. <br />Solids accumulation in tanks indicates they should be pump- <br />ed out this year to help prevent future problems. <br />❑ Solids accumulation in tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />O System is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate surface discharge. <br />❑ Inspection risers missing —tanks could not be inspected. <br />Inspection risers 14" die. pipe) must be installed in each tank <br />at next pumpout. If tanks have not been pumped out within <br />the last three years, they should be pumped out now. <br />❑ Inspection pipe is located directly over tank baffle. IDoes not <br />give accurate measurement of solids accumulation-) If tanks <br />he" not been pumped out within the lest three years, they <br />should be pumped out now. <br />Drainfield inspection indicates <br />❑ Drainfield is dry, no surfacing evident. <br />JR Some evidence of surfacing, not critical yet. <br />❑ Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace- <br />ment or additions to drainfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />❑ Drainfield extent and condition unknown. <br />SITE CHARACTERISTICS. <br />Limiting Site Factors <br />Potential for System Failure <br />Site Capabilities for <br />❑ Slope <br />(depends on soil types, water <br />Future Expansion <br />❑ So.l <br />table, and system condition) <br />Adequate <br />❑ High water table <br />❑ Low <br />❑ Fair <br />❑ Lot size <br />® Medium <br />❑ Poor <br />❑ Lake, wetland, or stream <br />10 High <br />❑ Inadequate <br />❑ Drainage <br />❑ System is causing visible <br />surface discharge. <br />COMMENTS <br />-- <br />Date of Inspection Septic Sys <br />Note. In the event that this inspection report is used to satisfy the requ,rementa for a mortgage o other rransler of property, be advi Inat <br />this report does not guarantee or certify that an existing system will continue to function properly. but is merely an optnrcn of the adequacy <br />of the system under current conditions based on the available information <br />This report must be kept on the premises with system (cation and pumtnng records. <br />WHITE COPY / Inspector's File GOLD COPY i Homeowner <br />
The URL can be used to link to this page
Your browser does not support the video tag.