My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1979-06-18 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Devin Lane
>
2315 Devin Lane - 03-117-23-22-0019
>
Septic
>
1979-06-18 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 12:15:19 PM
Creation date
9/3/2025 12:11:37 PM
Metadata
Fields
Template:
x Address Old
House Number
2315
Street Name
Devin
Street Type
Lane
Address
2315 Devin Lane
PIN
0311723220019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />53-4 6-9-79 <br />0 - <br />2.0' <br />clack clay loon topsoil (may be fill) <br />2.0 - <br />6.56 <br />3rawn sandy clay - -moist (mottling below 41) <br />6.5 - <br />8.0' <br />Light brown silty clay - firm <br />Dry at <br />time of <br />boring 12 a 30 p.m. 6-9-79 <br />Water <br />level " <br />60'0' 12s15 p.m. 6-10-79 <br />s3-5 <br />6-9-79 <br />0 - <br />2.0' <br />Dark brown clay loam topsoil (;day be fill) <br />2.0 - <br />3.0' <br />3rown sandy cla.-, (moist) <br />3.0 - <br />3.5' <br />3rown clayey sand <br />3.5 - <br />5.0' <br />3rown sandy clay - moist - soft <br />(Bottling below 4.5' ) <br />5.0 <br />5.5' <br />Cark brown water bearing clayey sand <br />Water <br />level 2 <br />3.9' 12a10 p.m. 6-10-79 <br />Percolation Rates <br />P-1 <br />23 minutes <br />per <br />inch <br />P-2 <br />23 minutes <br />per <br />inch <br />P-3 <br />20 -minutes <br />per <br />inch <br />P-4 <br />25 minutes <br />per <br />inch <br />P-5 <br />35 minutes <br />per <br />inch <br />P-6 <br />36 -minutes <br />per <br />inch <br />A :meeting war held on the site last week with Ar. Qullickson, dike <br />Caffron, of the City of Orono, and -myself present to review the findings <br />of the tests and discuss the possible systems, locations, etc., and <br />how they would best be utilized on.this property. The conclusion was <br />lat a mound system would be mist satisfactory in the location <br />the sketch. <br />3 mound system using a rock area of 10' x 50' with 3 <br />rated distribution pipes is recom•lended. The uphill face <br />and should have a varying slope which is flatter at the <br />order to divert the runoff around either end. The details <br />and construction are shown in the "Orono .Bound Package". <br />r information is required please feel free to call me. <br />Yours ver:i truly, <br />Car 1 W. 3org P. L <br />Ainn. Reg #750 <br />WI <br />
The URL can be used to link to this page
Your browser does not support the video tag.