My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1978-09-28 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Devin Lane
>
2280 Devin Lane - 03-117-23-22-0016
>
Septic
>
1978-09-28 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2025 10:15:16 AM
Creation date
9/3/2025 10:09:41 AM
Metadata
Fields
Template:
x Address Old
House Number
2280
Street Name
Devin
Street Type
Lane
Address
2280 Devin Lane
PIN
0311723220016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Mounds shall not be located on natural slopes of more than <br />6 percent if the percolation rate is slower than 30 minutes <br />per inch in all layers of natural or fill soil to a depth <br />of at least 24 inches below the sand layer of the mound. <br />D. Mounds shall not be located on natural slopes exceeding.12 <br />percent tinder any soil percolation rate condtditions. <br />E. Mounds shall not be located on any soil where the percolation <br />rate in any layer of natural or fill soil to a depth of at <br />least 24 inches below the sand layer of the mound is slower <br />than 120 minutes per inch. <br />2. CONSTRUCTION EQUIPMENT <br />, rubber -tired tractor may be used for plowing or disking to <br />prepare the soil surface but in no case shall a rubber -tired <br />tractor be uses after the surface preparation is completed. A <br />crawler or track -type tractor shall be used for mound const..:uc- <br />tion. <br />3. SOIL SURFACE PREPARATION <br />A. The discharge pipe from the pump to the mound area shall be <br />installed prior to soil surface preparation. The trench <br />excavated to install the discharge pipe shall be carefully <br />r3ckfilled and compacted to prevent seepage of effluent. <br />B. The total area selected for the mound, includii,g that under <br />the dikes, shall be roughened in order to thoroughly break up <br />any existing sod layer and to provide a suitable transition <br />zone between the original soil and the sand layer of the <br />mound. The area shall be roughened only when the moisture <br />content of the soil 8 inches below the surface is drier than <br />the plastic limit. <br />Plastic limit is the soil moisture content below which the <br />soil may be manipulated for purposes of installing a soil <br />treatment system, and above which manipulation will cause <br />compaction and puddling. If. a fragment of soil can easily be <br />rolled into a w.re 1/b inch in diameter, the moisture content <br />is above the plastic limit. if the soil is dry t_ugr to be <br />friable and falls apart when rolling it into a wire, the <br />moisture content is below the limit, and the soil may be man- <br />ipulated. The standard method of determining the plastic <br />limit is specified in American Association of State Highway <br />Officials (AASHO) Desionation: T 90-61. <br />
The URL can be used to link to this page
Your browser does not support the video tag.