My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
05-23-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
9/2/2025 1:19:45 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/23/1988
Retention Effective Date
9/2/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The project costs are proposed to be assessed to the benefiting property <br />iowners in the drainage area on a square foot basis. The street modifications <br />are proposed to be assessed to the benefiting property owners along the street <br />on a front foot basis. <br />The estimates do not include costs for temporary or permanent easements <br />necessary to construct the proposed storm sewer system. <br />CONCLUSIONS AND RECOMMENDATIONS <br />The project as reviewed herein is feasible as it relates to general <br />engineering principals and const:'.. '.-on procedures. Based on information <br />contained in this report, it is recommended that: <br />1. This report be adopted by the City of Orono as a guide for con- <br />struction of the storm sewer improvements it L►•k_' Highwood area. <br />2. The City conduct a legal and fiscal review of the project prior <br />to a public hearing. <br />3. A public hearing be held to determine further action to be tak- <br />en. The property owners in the drainage area which are proposed <br />to be assessed should be notified for hearing purposes. <br />4. The following schedule be followed if the project is to proceed: <br />Receive Preliminary Report March 14, 1988 <br />Hold Public Hearing April 11, 1988 <br />Order Plans and Specifications April 11, 1988 <br />Approve Plans and Specifications April 25. 1988 <br />Receive Bids May 13, 1988 <br />Award Contract May 23, 1988 <br />Start Construction June 6, 1988 <br />Complete Construction June 30. 1988 <br />5 - <br />Rpt13933 <br />
The URL can be used to link to this page
Your browser does not support the video tag.