My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
05-23-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
9/2/2025 1:19:45 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/23/1988
Retention Effective Date
9/2/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Two alternates are provided for constructing the outfall line. Alternate <br />One provides for following the existing alignment and Alternate Two provides <br />for moving the outfall line west to an alley. The area where the outfall line <br />is proposed for either alternate is congested. Construction will result in <br />considerable disruption of existing driveways and yard areas. The outfall <br />line should be constructed as 21 inch reinforced concrete. <br />The street modifications on Highland Road vould consist of placing a var- <br />iable thickness (1/20 to 30) bituminous surface vith a berm curb to control <br />the runoff. The storm water runoff would be directed northeast into the new <br />storm sewer system. The proposed street modifications will raise the street <br />grade. This could exacerbate some current grade problems between the street <br />and the garages. <br />PROJECT COST AND ASSESSMENT <br />The project cost and assessment rates for the storm sewer improvement are <br />outlined in this section with a detailed cost estimate provided in the Appen- <br />dix. The indicated prices are as projected for the 1988 construction season <br />(ENR 4500). <br />Estimated Project Cost <br />Alternate I <br />Alternate II <br />Street Modifications <br />4 - <br />Rpt13933 <br />Total Cost <br />$19,500 <br />25,000 <br />8,250 <br />Cost/S.F. Cost/L.F <br />$0.07 --- <br />0.10 --- <br />--- $ 13.75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.