Laserfiche WebLink
APPENDIX <br />COST ESTIMATES <br />ALTERNATE I <br />180 <br />Lin.ft. <br />8' PVC e $20.00/lin.ft. <br />$3,600.00 <br />2 <br />Each <br />Catch basin @ $1,000.00 <br />2,000.00 <br />10 <br />Each <br />Rip rap 1 $50.00/cu.yd. <br />500.00 <br />LUMP <br />SUM <br />Grade overflow @ S1,000.00/L.S. <br />1,000.00 <br />Total Construction <br />$7,100.00 <br />+ 30Z Legal, Engr., i Admin. <br />2,130.00 <br />Total Project Cost <br />$9,230.00 <br />ALTERNATE II <br />130 <br />Lin.ft. <br />10' PVC @ j25.00/lin.ft• <br />'v3,250.00 <br />50 <br />Lin.ft. <br />8' PVC 8 $20.00/lin.ft. <br />1,OQO.00 <br />2 <br />Each <br />Catch basins ! $1,000.00/ea. <br />2.000.00 <br />10 <br />Cu.yds. <br />Rip ran @ $50.00/cu.;•d. <br />500.00 <br />LUMP <br />SUM <br />Grade overflow @ $1,000.00/L.S. <br />1,000.00 <br />Total Construction <br />$7,75u.n0 <br />+ 30Z Legal, Engr., i Admin. <br />2,350.00 <br />Total Project Cost <br />$10,100.00 <br />ALTERNATE III <br />130 <br />Lin.ft. <br />18' PVC @ $35.00/lin.ft. <br />$4,550.00 <br />30 <br />Lin.ft. <br />15' PVC a $30.00/lin.ft. <br />900.00 <br />10 <br />Lin.ft. <br />8' PVC t $20.00/lin.ft. <br />200.UO <br />2 <br />Each <br />Catch basins @ $1,000.00/ea. <br />2.000.00 <br />10 <br />Cu.yds. <br />Rip rap @ $50.00/cu.yd. <br />500.00 <br />Total Construction <br />$8,150 00 <br />+ 30Z Legal, Engr., i Admin. <br />2,450.00 <br />Total Project Cost <br />$10.600.00 <br />9 <br />01391179 <br />