My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
05-23-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
9/2/2025 1:19:45 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/23/1988
Retention Effective Date
9/2/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DISCUSSION <br />The drainage area for this watershed is approximately 3.25 acres as shown <br />on Figure 1. The topography is rolling and high rates of runoff would be <br />expected. There is some temporary ponding available if the backyard areas are <br />flooded. <br />We reviewed three alternates for providing the storm water outlet <br />capacity. Alternate I would be to design for maximum storage with minimum <br />outlet capacity. Alternate II would be to design for a safe amount of storage <br />with a modest outlet capacity. Alternate III would be to provide for minimal <br />storage and a maximum outlet capacity. The environmental impact for each of <br />the alternates varies significantly. <br />Alternate I would provide an eight inch outlet pipe with approximately 0.5 <br />acre-feet of storage required in a major storm. This could bring the water <br />elevation above the garage floor at 3055 Casco Point Road. The construction <br />of an overflow drainageway would be necessary with this alternate. <br />Alternate II would provide a ten inch outlet pipe with approximately 0.35 <br />acre-feet of storage required in a major storm. This would bring the water <br />elevationi to a point 0.5 feet below the garage floor at 3055 Casco Point <br />Road. The construction of an overflow drainageway would be desirable with <br />this alternate. <br />Alternate III would provide an eighteen inch outlet pipe and virtually no <br />storage would be required. The construction of an overflow drainageway would <br />not be necessary with this alternate. <br />- 4 - <br />01391119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.