Laserfiche WebLink
1,.1T( 2 3 19�� <br />To: Mayor Grabek 17' ;1z <br />Orono City Council MembersrJ <br />City Administrator Bernhardson <br />From: Jeanne A. Mabusth, Building & Zoning Administrator <br />Date: May 19, 1988 <br />Subject: #1273 Rollin & Sharon Lacy 2655 North Shore Drive - Conditional <br />Use Permit and Variance - Public ;tearing <br />Zoning District - LR-lA <br />Pertinent Ordinances - 10.22, Sub. ion 2 Applicant wishes to fill <br />within 75' of the lakeshore where : 11 is allowed. Section 10.03, <br />Subdivision 19 A Condition Use Permi _ ::s required for filling within the <br />lakeshore area. <br />List of Exhibits <br />Exhibit <br />A <br />- Application <br />Exhibit <br />B <br />- Property Owners List <br />Exhibit <br />C <br />- Plat Map <br />Exhibit <br />D <br />- Applicants Addendum <br />Exhibit <br />E <br />- Applicants Sketch of Fill Project <br />Exhibit <br />F <br />- Survey of Property <br />Exhibit <br />G <br />- Staff Sketch <br />Review of Application - As applicants' addendum notes, the erosion of the <br />shoreline has gradually made its impact, but sustained severe erosion <br />damage with last years storm in July. The erosion noted around the tree <br />areas was sustained during the sever storm. The irregular shoreline from <br />the normal amount of erosion along the shore can be observed by the <br />existing shorelines to the east and west that have already been rip -rapped. <br />The applicants have filed for a rip -rap permit with the Minnehaha Creek <br />Watershed District. It was their intention to fill behind the rip -rap to <br />restore the lakeshore bank and was advised by staff that a Conditional Use <br />Permit and variance would be required. The applicant proposes a total <br />amount of 339 cubic yards of fill. <br />Staff inspected the lakeshore with the city engineer and he advised that <br />the high part of the rip --rap (portion of the rip -rap that abuts the land <br />sloping to the lake) that runs to the east of the dock should line ul <br />approximately with the center of the first dock section. The intent is to <br />line up with the rip-ial, with the east property and would approximately set <br />it just to the edge of :.he pump station. The large tree that has been cut <br />at the lakeshore would have to be removed in order for the rip -rapping to <br />be installed. The engineer notes that the exposed cottonwood roots have <br />already died off and should be trimmed out and filled. To the west of the <br />dock rip -rap should again line up somewhat with the mid section of the dock <br />and then arch over to line up with the west property rip -rap. Filling <br />behind the rip -rap in that location will protect the 7 or 8 pines along the <br />shoreline. Observe the rip -rap and bank slopes of the west property lire, <br />the proposed inprovement will match exactly with the west property line. <br />