My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
05-23-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
9/2/2025 1:19:45 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/23/1988
Retention Effective Date
9/2/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l <br />December 10, 1987 <br />Clifford Reep 475-1 ©1 6 <br />Shoreline and Develcpment Consultant <br />1682O Edgewood Av. Wayzata, MN 55391 <br />Ms. Jeanne Mabusth <br />Orono Planning Commission Menbers <br />P.O. Box 66 <br />Crystal Bay, MN 55323 <br />RE: Jan R. Waye, Zoning file #1222 <br />Enclosed are the following exhibits which are being submitted to supplement your <br />review of the Variance/Conditional Use Permit for After -the -Fact bank restora- <br />tion resulting from storm damage occouring at property owned by Mr. Jan Waye. <br />Exhibit I - Vegetation restoration plan prepared by James Robin, Landscape <br />Architect, dated 12/3/87. <br />Exhibit J - MCWD permit for After -the -Fact placement of 150 lineal feet of <br />shoreline erosion protection, dated 11/24/67. <br />Exhibit K - Comparison bank restoration plans for Ms. Elanor Stevenson c/o <br />Ms. Haverstock, MCWD After -the -Fact permit and site photos. <br />Exhibit L - Comparison bank restoration plans for Michael Sill/Ray Mithun, <br />MCWD After -the -Fact permit and site photos. <br />Exhibit M - This letter and enclosf-d discussion dated 121/10/87. <br />The do issues of significance with regard to the review cf this project are 1) <br />the integrity of the rock placement, and 2) the ability to revegetate the slope. <br />Two other bank restoration projects similar in design have been constructed by <br />Mr. Niccum, the contractor. The first project for Ms. Haverstock, at 3350 North - <br />home RD., Deephaven, used 792 tons of Class IV & V rock on the face with Class I <br />& II rock as fill. The placement extended 16' waterward of the NOHW and the <br />rock is 11' deep in the center. The face slope of the rock is 2:i, with the <br />sides approaching a 1 1/2:1 slope. The vegetation being established is <br />Polygonum, or commonly refered to as Fleeceflower. <br />The second restoration project for Michael Sill and Ray Mithun, at 3610 North - <br />home RD, Deephaven, used 576 tons c,f Class IV & V rock on the face with C1assI & <br />II rock as fill. The placement extended 6' waterward of the NOHW and the rock <br />is 14' deep in the center. The face slope of the rock is 1 1/2:1. The voids in <br />the rock have been filled with dirt to encourage natural vegetation regrowth. <br />Both of these projects were reviewed and approved as After -the -Fact. applications <br />by the Minnehaha Creek WSD as acceptable for design integrity and construction <br />methods for projects of this type. <br />
The URL can be used to link to this page
Your browser does not support the video tag.