My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
05-23-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
9/2/2025 1:19:45 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
5/23/1988
Retention Effective Date
9/2/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
393
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tr <br />4 a. (.i ; I <br />October 20, 1 8 Cl (ford Reep 475-1 81 6 <br />Shoreline and Development Consultant <br />16820 Edgewood Av. Wayzata, MN 55391 <br />Ms. Jeanne Mabusth <br />Planning and Zoning Administrator <br />City of Orono <br />P.O. Box 66 <br />Crystal Bay, MN <br />BE: Shoreline and bank stabilization for Mr. Jan Waye, Fagerness Point, Orono. <br />Dear Ms. Mabusth: <br />With regard to our phone conversation yesterday, I have enclosed a completed <br />Conditional Use Application form and a copy of the "after the fact" drawing of <br />the work completed. <br />The project consists of the placement of Class IV + V red limestone boulders on <br />two areas of the property that had bank failure resulting from the rainfall on <br />July 23, 1987. <br />Mr. Niccum, the Contractor, used a crane to lift the boulders and ;.and set them <br />individually, so as to lock them together in a tight fitting uniform slope. The <br />voids between the rocks have been filled with black dirt to encourages a rapid <br />regrowth of vegetation. In the next few years the vegetation will become <br />established and completely obscure the rock below. <br />I✓ <br />The construction method includes the placement of a silt fabric against the <br />damaged bank to allow the relief of hydraulic preasues from the Link. This fabric <br />also restricts soil erosion of the existing bank. <br />The project also included the placement of 150 lineal feet of Class I + II red <br />limestone rip rap as shoreline erosion protection. <br />The Conditional use permit is being requested for "after the fact approval" as <br />the work has been completed to prevent additional damage to the bank and <br />shoreline. <br />Should you have any questions after reviewing this application, please contact <br />■e. <br />Respectfully Submitted, <br />t <br />C*4110 <br />Clifford Beep <br />cc J. Waye <br />
The URL can be used to link to this page
Your browser does not support the video tag.