Laserfiche WebLink
(1) Building location,height,bulk and ere footage; <br /> (2) Type and square footage of specific land uses; <br /> (3) Number of dwelling units; <br /> (4) Detailed street and utility locations and sizes; <br /> (5) Parking layout; <br /> (6) Drainage plan,including location and size of pipes and water storage areas; <br /> (7) Grading plan and drainage plan,including two-foot contours; <br /> (8) Generalized landscape plan; <br /> (9) Generalized plan for uniform signs and lighting; <br /> (10) Plan for timing and phasing of the development; <br /> (11) Covenants or other restrictions proposed for the regulation of the development; <br /> (12) Renderings or elevations of all sides of buildings to be constructed in the first phase of the development; <br /> (13) Trail plan;and <br /> (14) Lighting plan. <br /> Approval of the master development plan shall indicate approval of the listed items in subsections(b)(1)—(b)(14)of this section and shall occur in <br /> conjunction with rezoning of the property to RPUD.After rezoning the property to RPUD,nothing shall be constructed on the RPUD site except in <br /> conformance with the approved plans and this section.The procedure for notification of and public hearing on the master development plan shall <br /> be the same as required for a zoning map amendment by this chapter. <br /> (c) Development agreement/financial guarantee. Following the approval of the master development plan but prior to final plan approval, <br /> the applicant shall enter into an agreement with the city relating to the terms of the RPUD development,and shall also provide such financial <br /> guarantees as the city requires or deems necessary.Such agreement may take the form of: <br /> (1) A development contract; <br /> (2) A site improvement performance agreement;and/or <br /> (3) Another form of binding instrument as may be required by the city. <br /> (d) Final site and building plan.Approval of a final site and building plan for the entire RPUD or for specific parts of the RPUD shall be <br /> subject to the procedures outlined in this division.The final site and building plan shall contain information as required by the city,including the <br /> following: <br /> (1) Detailed utility,street,grading and drainage plans; <br /> (2) Detailed building elevations and floor plans; <br /> (3) Detailed landscaping,sign and lighting plans;and <br /> (4) Detailed trail plan. <br /> (e) Substantial compliance.The final site and building plan shall be in substantial compliance with the approved master development plan. <br /> Substantial compliance shall mean: <br /> (1) Buildings,parking areas,roads and trails are in substantially the same location as previously approved; <br /> (2) The number of residential living units has not increased or decreased from that approved in the master development plan; <br /> Page 9 <br />