Laserfiche WebLink
The project costs are proposed to be assessed to the benefiting property <br />owners in the drainage area on a square foot basis. The street modifications <br />are proposed to be assessed to the benefiting property owners along the stroc t <br />on a front foot basis. <br />The estimates do not include costs for temporary or permanent easements <br />necessary to construct the proposed storm sever system. <br />CONCLUSIONS AND RECOMMENDATIONS <br />The project as reviewed herein is feasible as it relates to general <br />engineering principals and cotist_•. '.!on procedures. Based on !^',Drmation <br />contained in this report, it is recommended that: <br />1. This report be adopted by the City of Orono as a guide f,., con- <br />struction of the storm sever improvements in the Highwood area. <br />2. The City conduct a legal and fiscal review of the project prior <br />to a public hearing. <br />3. A public hearing be held to determine further action to be tak- <br />en. The property owners in the drainage area which are proposed <br />to be assessed should be notified for hearing purposes. <br />4. The following schedule be followed if the project is to proceed: <br />Receive Preliminary Report March 14. 1988 <br />Hold Public Hearing April 11, 1988 <br />Order Plans and Specifications April 11. 1988 <br />Approve Plans and Specifications April 25. 1988 <br />Receive Bids May 13, 1988 <br />Award Contract May 23. 1988 <br />Start Construction June 6, 1988 <br />Complete Construction June 30. 1988 <br />- S - <br />Rp!:3933 <br />