Laserfiche WebLink
1,600 <br />Ton <br />Class 5, i00i crushed aggregate base @ <br />DOLLARS CENTS $ <br />/ton $ <br />250 <br />Ton <br />2331 bituminous base course @ <br />DOLLARS CENTS $ <br />/ton $ <br />250 <br />Ton <br />2341 bituminous wear course @ <br />DOLLARS CENTS $ <br />/ton $ <br />30 <br />Ton <br />Bituminous material for mixture @ <br />DOLLARS CENTS $ <br />/ton $ <br />200 <br />Vdls. <br />Bituminous material for tack coat @ <br />DOLLARS CENTS $ <br />/gal $ <br />20 <br />Ton <br />Bituminous material for driveways @ <br />_ <br />DOLLARS CENTS $ <br />/ton $ <br />500 <br />Sq.yde. <br />Sod with topsoil @ <br />DOLLARS CENTS $ <br />/sq yd $ <br />.5 <br />Ac. <br />Seeding with mulch in place @ <br />DOLLARS CENTS $ /acre $ <br />250 <br />Cu.yds. <br />Topsoil borrow (C.V.) @ <br />DOLLARS CENTS $ <br />/cu.yd. $ <br />TOTAL BASE BID ..............................$ <br />The final amount of the contract shall be determined by multiplying the final <br />measured quantities of the various items actually constructed and installed by <br />the unit prices stated therefor. in the manner prescribed in the specifica- <br />tions. However, the low bidder shall be determined by adding the sums result- <br />ing from multiplying the quantities stated ' , the unit prices bid therefor. <br />Accompanying this bid is a bidder's bond, ::ertiiied check or cash deposit in <br />the amount of DOLLARS CENTS ($ ) <br />which is at least five percent (52) of the amount of my/our bid made payable <br />to the City of Orono. Minnesota, and the same is subject to forfeiture in the <br />event of default on the part of the undersigned or failure on the part of the <br />undersigned to execute the prescribed contract and bond within fifteen (15) <br />days after its submittal to me/us. <br />ORI1�)30 <br />