My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-25-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/25/2025 12:59:10 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/25/1988
Retention Effective Date
8/25/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2341. PLANT MIXED BITUMINOUS PAVEMENT <br />Specific Requirements <br />2341.0. SPECIFICATION REFERENCE: Section 2341 of the State of Minnesota, De- <br />palLment of Transportation, "Standard Specifications for Highway Construc- <br />tion", 1983 Edition, and all amendments thereto, shall apply except as modi- <br />fied or altered in the following Specific Requirements. <br />2341.1. DESCRIPTION: This work shall consist of the construction of a plant <br />mixed wear course over a bituminous base course. The wear course shall be <br />1-1/2 inches compacted thickness as shown on the typical section. The <br />contractor shall saw cut all existing bituminous driveways to provide a smooth <br />transition from the new surface to the old surface. <br />2341.2.1. Aggregate: Aggregate material used for this project shall be in <br />accordance with Mn/DOT Section 3'39 (BA-1). Driveway mixture shall be modified <br />to required 100I passing the 5/8' sieve. <br />2341.3.2. Proportioning: The percentage of weight of bitumen is estimated at <br />6.51 for the wear course.. <br />2341.3.3. Treatment of Surface: The bituminous base course shall receive a <br />tack coat of 0.05 gals/sq.yd. prior to placement of the wear course unless <br />otherwise directs `,v the Engineer. <br />2341.6. BITUMINOUS SPILLWAY: To be placed as directed by the Engineer. <br />Payment shall be made on the ton basis under 2341 bituminous wear. <br />OR13934 <br />Copyright 1988 <br />Bonestroo, Rosene, Anderlik <br />6 Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.