My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-25-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/25/2025 12:59:10 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/25/1988
Retention Effective Date
8/25/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2211. AGGREGATE BASE <br />Specific Requirements <br />2211.0. SPECIFICATION REFERENCE: Section 2211 of the State of Minnesota, De- <br />partment of Transportation, 'Standard Specifications for Highway Construc- <br />tion', 1983 Edition, and all amendments thereto, shall apply except as modi- <br />fied or altered in the following Specific Requirements. <br />2211.2.1. AGGREGATE: Aggregate material used for this project shall be in ac- <br />cordance with Mn/DOT Section 2211 for Class 5 gravel base (1001 crushed) or <br />for Class 3 aggregate base. <br />2211.3. CONSTRUCTION REQUIREMENTS: The subgrade shall be inspected, checked, <br />and approved by the Engineer prior to placement of aggregate base. <br />The aggregate base shall be compacted by the method called "specified density' <br />to 10OZ standard density in accordance with specified density requirements. <br />Driveways shall be regraded where necessary as directed by the Engineer. Six <br />inches of Class 5 shall be placed on all driveways. <br />2211.4. METHOD OF MEASUREMENT: Aggregate base Class 5 used on this project <br />shall be measured by weight in tons of material deposited on rhe roadway as <br />required by the typical section shown on the plans. <br />2211.5. BASIS OF PAYMENT: Payment for aggregate base Class 5 shall be by the <br />ton compacted inplace. Nhere, in the opinion of the Engineer, aggregate base <br />is being wasted, deductions in the quantity of base for payment purposes will <br />be made on the basis of 110 pounds per square yard inch of thickness. <br />OR13934 <br />Copyright 1988 <br />Boneotroo, Rosene, A^deriir <br />& At;sou iat c's , Lli( - <br />
The URL can be used to link to this page
Your browser does not support the video tag.