My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-25-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-25-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/25/2025 12:59:10 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/25/1988
Retention Effective Date
8/25/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />MINtIT-` "— THE PLANNING COMMISSION MEP.TING HELD MARCH 21, 1986 <br />11223 WALDRON CONTINUED <br />Mr. Waldron felt there were no other proposals that <br />would work for them, therefore requested Planning <br />Commission to make their recommendation at this time. <br />It was rnrved by Chairman Kelley, seconded by Bellows, to <br />recommend denial of the 3' excavation cut in the <br />lakeshore yard and 0-75' hardcover variance; and <br />recommend approval of the average lakeshore setback <br />variance to construct the deck as proposed. Motion, <br />Ayes 3, Nays 1. Brown voted nay. Motion carried. <br />i1233\ MICHAEL HALLEY HOMES INC. <br />��ENCE LANE <br />CONDITIONAL USE PERMIT AND VARIANCE <br />AMENDED APPLICATION - SECOND REVIEW <br />Architect Larry Kollmeyer <br />Michael Halley Homes for this <br />was present representing <br />matter. <br />Jacobs explaii.rd the request for a conditional use <br />permit and variance to reconstruct an existing retaining <br />wall within 75' of the lake; and install a drainage pine <br />within 75' of *ne lake. <br />Chairman Kelley read the City Engineer's recommendation <br />of this proposal. <br />It was noted that the proposal includes constructing a <br />walkout basement with a berm between the home and the <br />lake. <br />Bellows felt that They -,pre being asked to solve a <br />problem (through a vi iance to the ordinanc( i that is <br />being created by the proposed de yn. <br />Chairman Kelley asked Mr. Kollmeyer w at the hardship <br />was to support granting the variance and conditional use <br />permit for th= drainage pipe? <br />Mr. Kollmeyer &.:i !,ct end ,-ate any specific hardship, <br />but questic,ieA wr,y a drainage pipe buried below the <br />surface of the yard wr�ri+d be % problem? <br />Bellows explained that ii, ou met pipe to the lake is not <br />in the spirit of Oren, -,totection of disturbing the <br />lakeshore and water quality. She fur*her explained that <br />the proposal is creating an uratural dr.. nage situation, <br />a solution affecting the 0-75' lakeshore yard being <br />created by the desire for a walkout basement. <br />Mr. Kollmeyei felt a 6-10" pipe would have an minimal <br />physical effect to the lakeshore. <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.