Laserfiche WebLink
MIND YES OF THE ORONO PLANNING COMMISSION <br /> MEETING HELD ON AUGUST 21, 1995 <br /> (#10 - #2049 Fred Guttormson& Chic Dwight - Continued) <br /> There were no public comments. <br /> Schroeder moved, Lindquist seconded, to approve replacement of the deck and screened <br /> porch in the existing footprint, not to exceed the footprint. Approval was recommended <br /> for the grade cut to allow a window or walkout door as proposed on the southeast side. <br /> No boulder walls would be allowed. Removal of the concrete slab on the east side, <br /> removal of the existing accessory structure to the so.ith, removal of the old access boat <br /> ramp and resodding of same, and removal of the dock at the shoreline to include the <br /> bench-deck area were recommended. Ayes 6, Nays 0. <br /> (#11) #2050 WILLIAM TOLES, 3165 NORTH SHORE DRIVE - VARIANCES - <br /> PUBLIC HEARING - 9:48-10:12 P.M. <br /> The Certificate of Mailing and Affidavit of Publication were noted. <br /> The applicant was present. <br /> Gaffron reported the application is for hardcover and average lakeshore setback variances <br /> to construct a pool on the lake side of the property, which was purchased by the applicant <br /> in July of 1995. The pool would create a 15' average lakeshore encroachment but would <br /> have no visual impact. A net decrease in the hardcover would result in the 75-250' zone <br /> from 33.1% to 32.6%. <br /> Gaffron compared the application to a 1988 variance approval, the hardcover square <br /> footage of which was allowed at that time, today, is now exceeded. There continues to be <br /> no hardcover in the 0-75' zone. The 75-250' zone was approved in 1988 for 29.5%, but <br /> exists at 33.1%, and is proposed at 32.6%. The 250 1500' zone was approved in 1988 for <br /> 24.1%, exists in 1995 at 20.4% and proposes no change. <br /> The two surveys from 1988 and 1995 each use a slightly different base lot area for each <br /> zone. What Gaffron thinks happened is the driveway portion was eliminated but rock <br /> beds that are in place were not looked at and the overhangs were listed separately. The <br /> 1988 circular driveway has been changed with not as much loop and the garage addition <br /> built. The applicant will take out the rock and plastic to be replaced with hard surface. <br /> The 1390 s.f of land in base area calculation change d 400 s.f of concrete patio would <br /> be in exchange for the pool. When the pool is built, here would be no hardcover within <br /> 115' of the lake. In looking at the hardcover as a per entage of the entire lot, there was <br /> 21.7% before, and as approved, in 1988, now existing at 22.1%, and proposed at 21.8%. <br /> 15 <br />