My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-09-30 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail East
>
2760 Deer Run Trail East - 04-117-23-13-0009
>
Previous address/PID(250 Old Crystal Bay Rd S)
>
Septic info
>
1984-09-30 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2025 2:20:56 PM
Creation date
8/21/2025 1:43:01 PM
Metadata
Fields
Template:
x Address Old
House Number
250
Street Name
Old Crystal Bay
Street Type
Road
Address
250 Old Crystal Bay Road
PIN
0400723130004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRENCH CONSTRUCTION DETAILS- <br />7 <br />PIPE TO NEXT 4" DIAMETER INSPECTION <br />T—INLET DROP BOX WELL WITH CAP <br />�/ 4 TO 6 INCH LAYER OF o <br />EARTH BACKFILL AT LEAST MARSH HAY OR STRAW AND <br />ABOVE TOP OF ROCK ! A LAYER OF RED ROS IN <br />o . <br />PAPER <br />4"-DiSTRIBUTION IP <br />AT LEAST 6" DEPTH OF CLEAN ° <br />•., ROCK 3/4" TO 2 '/2" DIA. o / <br />DROP BOX �— �� <br />MAXIMUM LENGTH - 100 FEET —•-{ <br />OVERFILL <br />�4 TO 6 INCHES <br />INSPECTION <br />W ELL <br />BACKFILL ° <br />0 <br />0 <br />° <br />NOTES: 1. BOTTOM OF TRENCH MUST BE FLAT ALONG <br />LENGTH. <br />2. SLOPE ON DISTRIBUTION PIPE IS BETWEEN <br />LEVEL AND 4 INCHES PER 100 FEET. <br />RECOMMENDED SLOPE IS I TO 2 INCHES PER <br />100 FEET. <br />3. DISTRIBUTION PIPE CAN BE PERFORATED <br />PLASTIC WITH '/2 INCH OR LARGER HOLES. <br />ROWS OF HOLES MUST ESE <br />r o ( �2" DEPTH OF LOCATED ALONG THE BOTTOM OF THE PIPE. <br />ROCK ABOVE ONE — FOOT AGRICULTURAL DRAIN TILE CAN <br />o —! PIPE BE USED WITH A 1/4 INCH SPACING. <br />ROCK ° AT LEAST 6" OF <br />ROCK BLOW 4. SCARIFY TRENCH BOTTOM AND SIDEWALLS <br />PIPE AS HIGH AS ROCK WILL BE PLACED IN THE <br />TRENCH IN ORDER TO EXPOSE NATURAL SOIL. <br />�— 18" TO 36" —J REMOVE LOOSE SOIL BEFORE PLACING ROCK. <br />G" `TO 12" OF <br />SO!L BACKFILL <br />—11. <br />5. WHERE TREES ARE PRESENT OR LIKELY TO BE <br />PRESENT DURING THE LIFE OF THE SYSTEM, <br />12 INCHES OF ROCK MUST BE PLACED UNDER <br />THE DISTRIBUTION PIPE. <br />IL <br />
The URL can be used to link to this page
Your browser does not support the video tag.