My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-07-25 Application for Septic Permit
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2905 Deer Run Trail - 04-117-23-24-0010
>
Septic
>
1995-07-25 Application for Septic Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 3:00:43 PM
Creation date
8/20/2025 2:57:07 PM
Metadata
Fields
Template:
x Address Old
House Number
2905
Street Name
Deer Run
Street Type
Trail
Address
2905 Deer Run Trail
PIN
0411723240010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.?i-7 7 <br />CITY OF ORONO SEPTIC SYSTEM PERMIT APPLICATION <br />Box 66 (2750 Kelley Parkway) <br />Crystal Bay, MN 55323 <br />JOB SITE ADDRESS: C L_9 fU D.41 1i.111 a:(Z . <br />Occupancy Type: Residential ✓ Commercial Other <br />Permit Type: New or Replacement System, $100.00 <br />Repair Existing System, $50.00 <br />(Tanks or Drainfield) <br />0.50 State surcharge added to above fees <br />*See fee schedule for non-residential permit fees <br />Owner's Name: 4 Sc� «.�t� L _ PhoneNumber'. 174 - 6 7 6 S <br />*tailing Address: 41k.,,4,44 .4.,. City: w4%r-4rA-- Z1p; 1EL1f, <br />Contractor's Name: 3j: Sr. % PhoneNumber.yW—/7` -z_ <br />Mailing Address: %old /fth 4.6 %A City:/ &% f►W 731x 11a 3 <br />DO NOT MAEL PAYMENT WITH THIS APPLICATION <br />GENERAL INSTRUCTIONS <br />1. Applications for septic system permits may be mailed or submitted in person at the City <br />Offices; however, permits will not be mailed out. The permit must be picked up in <br />person at the City Offices ae-!' work must not begin unless the permit card is on the job <br />site. <br />2. Permits will be issued only to contractors holding a City of Orono Septic System <br />Installers License. <br />3. All work must be done ir. accordance with the approvP-' rystem design. Design <br />reports are not considered approved urdess "City of Orono Septic <br />System Approval" cover sheet sign' <br />4. The following insr ctions will be req, <br />A. Pre -installation Site inspection to in. L"��U1 general contractor. <br />B. Tank installation prior to covering. <br />C. Drainrield trench installation prior tc , aspection is required <br />after rough -up but prior to sand piact ... ce jar tested for silt content), <br />&Ud again during pressure distribution �...g installation in the rock bed. <br />D. Final inspection to verify pror. . final cover depths and to verify that all pump station <br />(wf_;; required) components are functional Ind comply with codes. <br />Individual holding MPCA Installer Certificate shall be present during inspections. A 24- <br />hour notice is required for all inspections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.