My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-04-17 Septic System Approval
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2905 Deer Run Trail - 04-117-23-24-0010
>
Septic
>
1995-04-17 Septic System Approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 2:59:42 PM
Creation date
8/20/2025 2:55:18 PM
Metadata
Fields
Template:
x Address Old
House Number
2905
Street Name
Deer Run
Street Type
Trail
Address
2905 Deer Run Trail
PIN
0411723240010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O � ' CITY OF ORONO <br />SEPTIC SYSTEM APPROVAL <br />ITY of ORONO <br />� ,� Munklpd Omces <br />Pad omce Boxt6 <br />CrysW Bsy, Minnesota S02MM <br />\9kESKo4`4� <br />LOCATION: 2905 Deer Run Tr. <br />OWNER: <br />GENERAL CONTRACTOR stickney & Schwi'IC CONTRACTOR: <br />SITE EVALUATOR: S—P Testing REPORT DATE: December 11. 1993 <br />The City of Orono has Approved your on -site system design as of April 17. 1995 <br />(approved -disapproved) (date) <br />with the following comments: <br />THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br />be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br />enclosed. <br />NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br />Inspector (473-7357). Call for inspections 24 hours in advance. <br />ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br />in place until final site grading. Approval to pour footings will not be granted until the Inspections D%partmevt <br />has verified that primary and alternate sites are adequately protected. <br />NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br />of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br />unusable prohibiting the timely completion and or Igniting the long term use of the property. <br />A site copy will be available at the City Offices ' r the septic contractor. <br />CITY OF R N <br />ByA I YZZ <br />Stephe -site Sy ems Manger <br />TEI.EmioNE - 473-73s7 • FAX . 4TJ4510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.