My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-12-11 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2905 Deer Run Trail - 04-117-23-24-0010
>
Septic
>
1993-12-11 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 2:59:42 PM
Creation date
8/20/2025 2:53:51 PM
Metadata
Fields
Template:
x Address Old
House Number
2905
Street Name
Deer Run
Street Type
Trail
Address
2905 Deer Run Trail
PIN
0411723240010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. If landslope is 2.9 percent or less, basal width ir.ciudes both the <br />upslope and downslope dike widths, <br />2. <br />Calculate minimum mound size based on geometery: <br />a. Determine depth of clean sand fill at upslope edge of rock <br />layer: Separation /. O feet <br />b. Multiply rock layer width by landslope to determine drop <br />in elevation; Slope Difference 3 yl <br />lo % + 100 = to feet <br />c. Add depth of clean sand depth of clean sand for I. <br />separation at upslope edge (2a) to depth of rock layer to ..... <br />rock depth and the depth of cover to find the total mound �- <br />height at upslope edge of rock layer; <br />/. O ft + 1 ft + 1 ft = 3.0 feet <br />d. Enter table on page bottom with landslope and upslope <br />dike ratio. Select dike multiplier of ? .`) o <br />e. Multiply mice multiplier by upslope mound height <br />to get upslope dike %idth: -I, j x i I feet <br />f. Add the depth of slope difference (2b) to the upslope <br />height to get the downslope height •c + . Z = feet <br />g. Enter table on page E-18 with landslope and downslope <br />dike ratio. Select dike multiplier of � . ? :�, _ <br />h. Multiply dike multiplier by downslope mound height <br />to get do slope dike width: 2— x y 3 : = I q feet •'� ��►31 •►'+ "� <br />i. Minin. 3m mound width is the sum of upslope dike <br />width plus rock layer width plus downslope dike width; <br />I I ft + _�U ft + _..c; ft _ Lj� feet <br />j. Subtract ! ium width G.i from the Absorption <br />width F 4 ' Additional Dox-. nclope required for <br />Absc 'ption <br />— - it - _'�ft = =Lj- <br />feet iPw <br />k. Add the Additional Downslope required for Absorpt;') <br />to the downslope dike width and recalulate the Total <br />Mound Width which is is the sum of uns;ope dike <br />width plus rock layer %:idth plus downslope dike % iath <br />—I j_ ft + _J_� ft +_ e,o_ft = --- feet <br />feet <br />1. Total mound length is the sum o► upslope dike width <br />plus rock layer length plus upslope dike idth; <br />�-- Tou! Length <br />/off <br />L)u,A 11? o1w PS 01V <br />31 ,1 SI 61 -1 ]1 ,1 it 61 7 61 <br />0 3.0 60 1 6o :U 17 ,P 5U 6U7 60 <br />417 <br />3.61 76 62S 'ss ♦ in: i>• na <br />S )S) S00 667 857 1'177 ��i ))i il❑ ,62 SIV i'1 <br />6 366 i2A 7.16 v' !21': 25i 3V 3!li 6A 4•3 i,l <br />?h0 7wi :37) 2:• 3:2 3713 623 ,"• 5 : 3 <br />6 3.vi ..n 6.33 :154 W '.:: 3'P 1 i7 { 16 ♦ :• t u <br />V l:! .J1 i314 2N )4i 3NI : 463 <br />,y n•.' .':0 tiUU :''3 :tl 2v. ;33 17i ,:: ,:.i <br />12 4 6v 7 69 214i 4, " : 21 2 7J 3 12 3 ,v 3 6c! 406 <br />
The URL can be used to link to this page
Your browser does not support the video tag.