My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-12-11 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2905 Deer Run Trail - 04-117-23-24-0010
>
Septic
>
1993-12-11 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 2:59:42 PM
Creation date
8/20/2025 2:53:51 PM
Metadata
Fields
Template:
x Address Old
House Number
2905
Street Name
Deer Run
Street Type
Trail
Address
2905 Deer Run Trail
PIN
0411723240010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P TESTING, INC. Steven B. schirmero — MPCA Cert. No. 627 <br />951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br />December 11, 1993 <br />Coffin site <br />Lot 3, Block 1 <br />Orono, Henn. Co., MN <br />This On -Site Sewage Treatment System is Designed for a Type 1, five <br />bedroom home in accordance with the Minnesota Pollution Control <br />Agency Chapter 7080 and local ort'_i".ances. <br />The soils on this site are SCS soils mapped - KkB - Kilkenny loam. <br />A seasonally hi,h water t:;3le was located at 20" to 32", (mottled <br />soil). Due to the seasonally high water table, a Pressurized <br />Mound System will need to be installed. The bottom of the rock <br />bed must be located at least 3' above the seasonally high eater <br />table. <br />The soils at a depth of 12" have a percolation rate averaging <br />8.3 min inch. <br />A pumping chamber will need to be installed to lift the effluent <br />to the treatment area. <br />The manifold and supply line pipe must have back drainage to the pumping <br />chamber. The distribution pipes shall have their ends capped. Be sure <br />the rock and sand fill material are clear.. The sod layer balow the <br />entire mounded area must be turned over, just break up the sod, be sure <br />not to over work. <br />The power supply and switches must be located outside the manhole and <br />pumping chamber in a weather proof enclosure. A warning device must <br />be installed with a light and sound device, this is in case of a pump <br />failure. Mercury floats are a good method. <br />All neighboring wells are: located greater than 100' away from the <br />proposed treatment area. <br />CONT'D <br />
The URL can be used to link to this page
Your browser does not support the video tag.