My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-12-10 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2875 Deer Run Trail- 04-117-23-24-0009
>
Septic
>
1993-12-10 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2025 10:07:31 AM
Creation date
8/20/2025 10:03:17 AM
Metadata
Fields
Template:
x Address Old
House Number
2875
Street Name
Deer Run
Street Type
Trail
Address
2875 Deer Run Trail
PIN
0411723240009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P TESTING, INC. <br />Steven B. Schirmers — MPCA Cert. N,o. 627 <br />Coffin Site <br />Lot 2, Block 1 <br />Orono, Henn. Co., MN <br />951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br />December 10, 1993 <br />This On -Site Sewage Treatment System is Designed for a Type 1, five <br />bedroom home in accordance with the Minnesota Pollution Control <br />Agency Chapter 708C and local ordinances. <br />The soils on this site are SCS soils mapped - KkB - Kilkenny <br />loam. A seasoriall}l hich water table was located at 22" to 44", <br />(mottled soil). Cue to i.iit aeas3null h h otnr *�h��; a <br />Pressurized Mound system will need to be installed. The bottom <br />of the rock bed :rust be located at least 3' above the seasonally <br />high water table. <br />The future expansion is at: the bash of a slope and to keep the <br />absorption area of the mouri-? 75' from a wetland, approximately <br />1/3 of the upslope portion of the mound will be or, 6 to 8% slope. <br />This will need tc he approved by city officials and rust remain <br />future expansion ::n!y. <br />The soils at a depth of 12" have a percolation rate averaging <br />6.8 min /inch. <br />A pumping chamber will need o be installed to lift the effluent <br />to the treatment area. <br />_.ie manifold and supply line pipe must have back drainage to the pumping <br />chamber. The distribution pipes shall Have their ends capped. Be sure <br />the rock and sand fill material are clean. The sod layer below the <br />entire mounded area must be turned over, just break up the sod, be sure <br />not to over work. <br />The power supply and switches must be located outside the manhole an,' <br />pumping chamber in a weather proof enclosure. A warning dt-!vice must <br />be installed with a light and sound device, this is in case of a pump <br />failure. Mercury floats are a qood method. <br />
The URL can be used to link to this page
Your browser does not support the video tag.