My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-11-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/19/2025 2:01:18 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/11/1988
Retention Effective Date
8/19/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1,600 Ton Class 5, 100Z crushed aggregate base @ <br />DOLLARS CENTS $ /ton $ <br />250 Ton 2331 bituminous base course p <br />DOLLARS CENTS $ __ /ton __ $ <br />250 Ton 2341 bituminous wear course @ <br />DOLLARS CENTS $ won S _ <br />30 Ton Bituminous material for mixture @ <br />DOLLARS CENTS $ ton <br />200 Gals. Bituminous material for tack coat @ <br />DOLLARS CENTS $ /gal. $ <br />20 Ton Bituminous material for driveway @ <br />DOLLARS _ CF <br />560 Sq.yds. Sod with topsoil @ <br />DOLLARS _ CENTS $ /sy.yd. $ <br />.5 Ac. Seeding with mulch in place @ <br />DOLLARS CENTS �_ /acre $ <br />250 Cu.yds. Topsoil borrow (C.V.) @ <br />DOLLARS CENTS $ /cu.yd. $ <br />TOTAL BASE BID ..............................$ <br />The final amount o. _ie contract shall be determined by .'tiplying the final <br />measured quantities cf the various items actually constructed and installed by <br />the unit prices stated therefor, in the manner prescribed in the specifica- <br />tions. However, the low bid.:er shall be determined by adding the sums result- <br />ing from multiplying the quantities stated by the unit prices bid therefor. <br />Accompc,nying this bid is a bidder's bond, certified check or cash deposit in <br />the amount of DOLLARS CENTS ($ ) <br />which is at least five percent (5Z) of the amount of my/our bid made payable <br />to the City of Orono, Minnesota, and the same is subject to forfeiture in the <br />event of default on the part of the undersigned or failure on the part of the <br />undersigned to execute the prescribed contract and bond within fifteen (15) <br />days after its submittal to me/us. <br />P-2 <br />OR13934 <br />
The URL can be used to link to this page
Your browser does not support the video tag.