My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-11-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/19/2025 2:01:18 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/11/1988
Retention Effective Date
8/19/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2575. TURF ESTABLISHMENT <br />S ecific and General Requirements <br />257.'.U. SPECIFICATION REFLRENCE: Unless otherwise noted or modified herein, <br />all sections of Mn/DOT Specification 2575 shall apply. <br />2575.1. DESCRIPTION: All disturbed .seas within the project shal' be seeded. <br />2575.2. MATERIALS: <br />A. Seed: Mixture 5 shall be used. <br />E. Fertilizer: A commercial grade specified as 12-12-12 shall be used. <br />F. Mulch Material: Type I mulch shall be used. <br />2575.3. CONSTRUCT -ON REQUIREMENTS: <br />A. General; The contractor is cautioned to salvage all available and suit- <br />able� topsoil from the project site for respreading on areas to be restored. <br />The contractor shall place a minimum of 3 inches of `opsail over all areas to <br />be seeded or nodded. <br />C. Applying Fertiliser. Fertiliser shall be applied at the sate of 400 pounds <br />per acre over all seeded areas of turf establibhmcnt. <br />D. Sowina Seed: Seed shall be applied at the rate of 50 pounds per acre over <br />all disturbed areas designated for seeding. Seeding shall be done as soon as <br />possible after finish grading has been completed. <br />E. Agp�jin MqJch: Mulch shall be disc anchored into the soil. The anchor- <br />ing equipment shall be operated in a general direction at right angles to the <br />direction of surface drainage wherever practical. Mulch shall be applied on <br />all seeded areas of turf estatlishment. <br />H. Mainten4nm The contractor shall be solely responsible for replacesfent <br />and/or repair of any seeded area that may vash-out, erode, or fail to grow <br />prior to acceptance with no additional cr,mp�,nsation therefor. <br />2.575.5. BASIS_ OF P,fMENT: The sod as bid in the proposal shall include 3 <br />inches of topsoil. The seeding as bid in the proposal shall include se-J <br />mulch, fertiliser and grading. The topsoil on the seeded areas shall be <br />for by the cubic. yard (CV) compacted in place. <br />C(,,%q--lght lose <br />! Sawatreo, eoaene, ♦nderl it <br />e Associate*, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.