My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-11-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
04-11-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/19/2025 2:01:18 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
4/11/1988
Retention Effective Date
8/19/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
L[ONAPD [ LINDO91fY <br />t AURCI,S V AC.YAN <br />G[w►LC[ Y.GNUSON <br />11 D Y.GI(NNON <br />(l V14 1 OP(N5T(IN <br />NUOCwT J.SH(wAN <br />If RAtI l .RAW 11[ <br />[VOENC R[.AT1N0 <br />JAMEs P YARIt"lt.0 <br />RICHARD J r17t0lwALD <br />$I..'IP J. ORTMUN <br />JOHN A rtlww[RT <br />WILLIAN E ro. <br />JOwN J COtINCLtY <br />JLR"OLD r.00ROVALR <br />DAVID N LEfEDOrr <br />JOHN H STROINMAN <br />DAVID G N[W«ALL <br />R V"TIS A Owt[,IL[I <br />ROR["T V A74,40R[ <br />PATRI C. DELANEY <br />HOWARD J. AAVr/MAN <br />RONALD G. VAN rI"E <br />"D.. O WIN51'" <br />L..V"ANCC R. WALUOCH <br />01CH4.0 R. sDLUN <br />THONAR N OARR[II III <br />OARYL[ L UVNOrr <br />,:A", J OAVE"POR, <br />MAR. " JOHNSON <br />R,CNAwD A PRIYVIw <br />R W.L11R RACNMAN <br />Jtrrwl, w SCHNIDT <br />1.M0T«/ N. •Vile" <br />POR[R♦ O MITCNCLL.JR. <br />J. NICNACL OADV <br />J REV." COSIL[I <br />"OfC.IJ NAR/MAN <br />JOf[PH O POHLC* <br />YAAT [ CU"7t" <br />RICHARD 0. MLNEIL <br />OOMAttl C• SW[NsON <br />TRUCE A. RON.I OUR <br />JANES P.M•CAIIT«Y <br />b"V[N J. JOHNSON <br />PII..AND INRIO <br />RODt PICA I.MACR[NtIE <br />7 wONAs O LOVEIT IN <br />0AV' <br />D f. V/C1COt <br />LYNN M. ANOCROOR <br />January 20, 1988 <br />Ms. Jeanne Ma <br />City of Orono <br />P. 0. Box C6 <br />Crystal Bay, <br />busth <br />LINDQUIST �L VENNUM <br />;�w;A`J 5[L[ONNOM <br />I[P[:Af RO"N(w <br />'CNN P Hov.ION <br />4200 105 CENTEn <br />D[NNIs N tlMAIL[Y <br />MINNEAPOLIS, MINNESOTA 55402 <br />r0% J J WIGSON <br />TELEPHONE 16121 371-3.111 <br />DANIrI ., SHE... <br />IiAVIU • ALLG(,[w <br />TELEX 29 0044 <br />ttwwt Nr( J rLt M1"O <br />TELECOPIER 113121 371-3207 <br />ROLI [NON <br />CABLE: LINLAW MINNEAPOLIS <br />011110wA I OSILUND <br />ROAw M. Pt GwN <br />WAYZATA Or(ICE <br />MAPTIN 11. wO5e NOAVM <br />(LINO. C. Rtls ENSILI" <br />740 EAST LAKE STREET <br />ROf AIINC N WIRIH <br />WAYZATA, MIN14ESOTA 5U391 <br />O[f"A R. PAGE <br />MICHAEL D OLAIfON <br />f USAN E. fARNCf <br />JO[L N.OPC[R <br />WRITER'S DIRECT DIAL NUMBER <br />DAVID L. HALL ETT <br />CHARLES . WCAVCR.JP <br />ANN M. PARR[NT <br />i73-4208 <br />DAVID L.5wR6 V"" <br />DAVID A. DONMA <br />O EM'a9 Q. REILLY <br />MN 55323 <br />Dear Ms. Mab,..sth : <br />JONAIMAN U. fr'. <br />IIYOtw• R fAr. <br />TIYOfwY f- Mr NICE <br />J ROO[RT ►AULSON.JR. <br />JOSEPH A THOMSON <br />JOs[Pw W. Docile" <br />ANN L IIJIMA <br />t 117 AOC1N G. Af• <br />W Il L1AM r. wIM <br />■ATwARIN( N N(LMf <br />WAL LACC O NILwC <br />C..OLtf I. YOORSC <br />..,I J0 POr.«' <br />LURE «. TERNAAR <br />MICH ACL J- VOUNO <br />AAREN L. •CHREINER <br />9V COUNfeI <br />NORMAN L. NCWNALL <br />wcnwtD <br />THOMAS VC.Nu. <br />On behalf of both Mr. and Mrs. John Waters and Mr. and Mrs. Jack <br />Dennis, we would 'ike to request that the City of Orono undertake <br />to have prepared a feasibility study to examine whether or not <br />the storm water run-off that fror Lime to time inundates portions <br />of the Waters' and Dennis' property ought to be the subject of a <br />storm drainage public improvement project. Based on the <br />conclusions of Greg Kopischke of Westwood Planning and <br />Engineering, the Waters' and Dennis' -eel that the storm <br />drainage run-off that is stored on their property from ti--)e to <br />time is not the result of an act of nature, but rather the result <br />of development upstream of both properties. Accordingly, our <br />clients are desirous of having a study undertaken to ascertain <br />whether other parties in addition to the Dennis' and the Waters' <br />should bcar some cost responsibility for the construction of a <br />storm drainage improvement. <br />Would you please send me whatever materials may be required by <br />the City to formally petition for such a :study to be undertaken. <br />Sincerely/�- <br />LINWU1ST !G VEff <br />id J. bZenp <br />DJD: cap <br />cc: Mr. and Mrs. Todd haters <br />Mr. ar!d t.rs. Jack Dennin <br />
The URL can be used to link to this page
Your browser does not support the video tag.