My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet Cc - regular meeting 4/11/1988
Orono
>
City Council
>
1988
>
Agenda Packet Cc - regular meeting 4/11/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:14:46 AM
Creation date
8/19/2025 2:01:18 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
regular meeting
Document Date
4/11/1988
Retention Effective Date
8/19/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COUNCIL MEETING HELD MARCH 28, 1988 <br />STORM SEWER - HIGHWOOD ROAD <br />City Administrator Bernhardson introduced the <br />feasibility study that was done in response to a <br />petition by ilighwood Tesidents requesting a solution to <br />a storm water ponding problem. Within the feasibility <br />report are two alternatives for storm water piping and a <br />third alternative Lo redo the road to redirect the <br />drainage down the hill int, .4 pipe. <br />City Engineer Cook reviewed the feasibility study. <br />Councilmember Sime felt that Alternative 1 was <br />preferable based on his knowledge of the drainage in the <br />neighborhood. <br />It was moved by Councilmember Sime, seconded by <br />Councilmember Peterson, to accept the storm sewer <br />feasibility report fcr the Highwood area as presented <br />and designate April 2�; 1988 as thy, public hearing date. <br />Motion, Ayes 4, Nays 0. <br />FEASIBILITY STUDY - BY-PASS LIFT STATION #10 <br />Councilmember Peterson asked why the feasibil.-.ty study <br />is being requested at this point in time whi::h to her <br />seemed after -the -fact? <br />MAYOR'S RZPORTs <br />City Administrator Bernhardson explained that they did <br />not want to spend the money on the study prior to an <br />agreement by the Metro Waste Control Commission to do <br />the project in the manner that would allow the City to <br />install the gravity line which is the subject of this <br />feasibility report. <br />It was moved by Councilmember Sime, seconded by <br />Councilmember Goetten, to direct the City Engineer to <br />perform a feasibility study for a sanitary sewer by-pass <br />of Lift Station #10 for as amount not to exceed <br />$2,500.00. Motion, Ayes 4, Nays 0. <br />There was no report from the Aayor. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.