My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-28-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
03-28-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/19/2025 11:35:28 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
3/28/1988
Retention Effective Date
8/19/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
496
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br />COST ESTIMATE <br />WATERMAIN REPLACEMENT FOR COUNTY ROAD 15 <br />FAIRVIEW LANE TO FERNSIDE LA14E <br />8" WATEWIN <br />1270 <br />L.F. <br />0 <br />$ 15.00/LF = <br />$ 19,050.00 <br />8" GATE VALVES <br />3 <br />EACH <br />a <br />500.00/EA = <br />1,500.00 <br />3/4" & 1" SERVICE CONNECTICN <br />20 <br />EACH <br />0 <br />40.0O/EA = <br />800.00 <br />3/4" & 1" CURB STOP <br />20 <br />EACH <br />0 <br />100.00/EA = <br />2,000.00 <br />1 1/2" SERVICE CONNECTION <br />3 <br />EACH <br />0 <br />200.00/EA = <br />600.00 <br />3/4" COPPER SERVICE PIPE <br />700 <br />L.F. <br />0 <br />8.00/LF <br />= 59600.00 <br />1 1/2" COPPER SERVICE PIPE <br />50 <br />L.F. <br />0 <br />11.00/LF <br />= 550.00 <br />FITTINGS <br />3000 <br />LBS <br />0 <br />1.00/LB <br />= 3,000.00 <br />HYDRANT <br />1 <br />EACH <br />0 <br />900.00/EA <br />= 900.00 <br />6" GATE VALVE <br />2 <br />EACH <br />0 <br />400.00/EA <br />= 800.00 <br />6" HYDRANT LEAD <br />25 <br />L.F. <br />0 <br />12.00/LF <br />= 300.00 <br />GRANULAR MATERIAL <br />200 <br />TONS <br />0 <br />8.00/TN <br />= 1,600.00 <br />MOBILIZATION <br />1 <br />L.S. <br />LUMP SUM <br />= 39000.00 <br />CONTINGENCIES 4,300.00 <br />TOTAL ESTIMATED CONSTRUCTION COST $44,000.00 <br />ENGINEERING, LEGAL, FISCAL & ADMIN. COST 11,000.00 <br />TOTAL ESTIMATED PROJECT COST ....................$559000.00 <br />1 V7(0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.