Laserfiche WebLink
LAKESHORE <br />SETBACK <br />ZONE <br />0-75' <br />75-250' <br />250-500' <br />500-1000' <br />Directions: <br />A. Existing <br />lot area <br />in zone <br />ORONO HARDCOVER CALCULATION WORKSHEET <br />B. Existing C. Existing D. Proposed E. Proposed <br />hardcover <br />hardcover hardcover hardcover <br />in zone percentage in zone percentage <br />( (B:A) x 100] ( (D:A) x 1001 <br />ZI 4 sf 0 sf e�__) % C-) sf a `/1 <br />•`sf <br />sf <br />sf <br />F. Allowed <br />hardcover <br />percentage <br />0 /, <br />O sf n 9, i }-OF, sf 1\ % 25 <br />sf <br />sf <br />Y. <br />sf 90 30 <br />°� sf "% _ 35 <br />A. Existing Lot Area in Zone - includes the total square footage of dry buildable land <br />within the specified zone. <br />B. Existing Hardcover in Zone - includes the square footage of existing roofs, decks, sidewalks, <br />driveways (gravel or paved) and other rain -impervious surfaces within the specified zone. <br />C. Existing Hardcover percentage - divide the number in B by the number in A and multiply by 100. <br />D. Proposed Hardcover in Zone - includes the existing hardcover plus all proposed additional <br />hardcover. <br />E. Proposed Hardcover Percentages - divide the number in D by the number in A and multiply by 100. <br />F. Allowed Hardcover Percentages - if the percentages in column E for any setback zone exceed <br />the allowed percentages in column F, you should contact the Zoning Department at 473-7357 <br />to discuss the possibilities of obtaining a variance. Generally, if a concurrent removal <br />cf existing hardcover matches the additional hardcover proposed, resulting in no net increase <br />of hardcover in a specified zone, a variance may not be necessary. <br />�11 <br />