My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-18-2025 - Agenda Packet Planning Commission - PC packet
Orono
>
Planning Commission
>
2025
>
08-18-2025 - Agenda Packet Planning Commission - PC packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:18 AM
Creation date
8/19/2025 9:13:02 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet Planning Commission
Section
Planning Commission
Subject
PC packet
Document Date
8/18/2025
Retention Effective Date
10/6/2025
Retention
Permanent After File Date
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10 <br />Project Number: <br />Drawn By: <br />Date of Issue: <br />Project Architect:the GARRETTaddition + remodel2410 <br />Dan Wallace <br />Dan Wallace <br />wallace <br />ARCHITECTURE, PLLC <br />311 Third Street <br />Excelsior, MN 55331 <br />952.913.9641 <br />These documents are instruments of <br />service, and, as such, remain the <br />property of wallace ARCHITECTURE, <br />pllc. Use or publication of these <br />documents requires written approval <br />from wallace ARCHITECTURE, pllc. <br />SD.1 - 12 Dec 2024650 N. Brown RoadLong Lake, MN 55356DD.1 - 18 Dec 2024 <br /> 21 Jan 2025 <br /> BID.1 - 25 Jan 2025SUMP <br />PITELECT.PANELELECTRICAL KEY <br />DUPLEX RECEPTACLE <br />SINGLE POLE SWITCH <br />WALL FIXTURE <br />LED STRIP LIGHT <br />4" RECESSED CAN LIGHT <br />VENTILATION FAN <br />R <br />GENERAL NOTES: <br />01. PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY FOR THE COMPLETE INSTALLATION OF THE <br />ELECTRICAL SYSTEM, INCLUDING POWER, WIRING, AND LIGHTING AS SHOWN ON THE DRAWINGS AND AS <br />REQUIRED ON SITE. <br />02. REVIEW LAYOUT OF ALL LIGHTING, SWITCHES, RECEPTACLES, AND ANY OTHER ROUGH-IN BOXES WITH THE <br />OWNER PRIOR TO THE START OF WORK. DO NOT SCALE DRAWINGS FOR THE LOCATIONS OF ELECTRICAL <br />DEVICES. <br />03. COORDINATE WIRING AND FIXTURE PLACEMENT WITH FRAMING, STRUCTURAL FRAMING, PLUMBING SYSTEM, <br />MECHANICAL SYSTEM, AND EXISTING ELECTRICAL SYSTEM PRIOR TO ROUGH-IN. DO NOT CUT OR ALTER ANY <br />STRUCTURAL ELEMENTS WITHOUT WRITTEN APPROVAL FROM THE ARCHITECT. <br />04. COORDINATE ROUGH-IN BOX LOCATION WITH SPECIFIC LIGHT SELECTED FOR THAT LOCATION PRIOR TO <br />INSTALLATION. <br />05. THERE IS TO BE AT LEAST ONE (1) INCH CLEARANCE BETWEEN THE FINISHED ELECTRICAL COVER PLATE AND <br />ANY ADJACENT SURFACE OR TRIM UNLESS OTHERWISE NOTED. <br />06. PROVIDE SMOKE DETECTORS AND CARBON MONOXIDE DETECTORS PER CODE. REVIEW LOCATIONS WITH THE <br />ARCHITECT PRIOR TO INSTALLATION. <br />07. PROVIDE ELECTRICAL HOOK-UPS AS REQUIRED ON THE LOWER LEVEL FOR ANY OTHER MISCELLANEOUS <br />EQUIPMENT SPECIFIED BY OWNER. <br />08. REVIEW TELEVISION, INTERNET, AND ANY OTHER MISCELLANEOUS WIRING REQUIREMENTS WITH OWNER PRIOR TO <br />CONSTRUCTION. REVIEW LOCATIONS WITH THE ARCHITECT PRIOR TO INSTALLATION. <br />09. ALL DECORATIVE LIGHT FIXTURES TO BE PROVIDED BY OWNER. <br />10. PROVIDE GFCI PROTECTED OUTLETS AS REQUIRED. <br />11. FIELD VERIFY WITH OWNER ANY ADDITIONAL EXTERIOR LIGHTING REQUIREMENTS. <br />R <br />FIELD VERIFY SWITCH <br />REQ. + PLACEMENT <br />FIELD VERIFYIF SWITCHRELOCATION REQ.FOR SLIDING DOORSCALE: 1/4" = 1'-0" <br />1 PLAN - lower level electrical <br />10 <br />62
The URL can be used to link to this page
Your browser does not support the video tag.