My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
02-22-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/18/2025 10:02:19 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
2/22/1988
Retention Effective Date
8/18/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENUIX U <br />REGIONAL CHANNEL REPORT <br />Report date Janus" 19. 1988 <br />Method of interconnection_ Fiberoutic link to IDS Center from tID with microwave <br />hop from IDS to Mound headcnd site. <br />Time period of study_ _,lanuar <br />Estimated costs $115,000 capital Costs slue $1: S1400/month me apAnp rent <br />Factors Involved In cost <br />Capital Costs: <br />Fiberoptic costa from WCCO to IDS, $25,000 <br />Receiver for Mound Headend, $30,000. Does not include headend coats. <br />Operating Costs, $1200 - $1400/month for fiberoptic link. <br />Technical considerations This method of interconnection ansumes.a line of site <br />from the IDS Center to existing Mound Tower. Loading factors are a consideration <br />for equipment weight, ice and wind. <br />Status: Accepted Rejected Pending Yee <br />If rejected, please give reasons v,hy rejected. <br />If sending, please state next steps to be taken on study and anticipated timellne. <br />1. L..siaeering studies involving a tower loading stress analysis. Teat for <br />en/ln to st nn n,. sn jyst <br />2. Tower height and line of site• <br />,j_. Permitting Prmee-s for in,,, oxtcnn ;f pc,e,hln Pro oosed Resolution. _ <br />Case 184-306, City of Mound, 2/13/84�.n <br />4. Determination of cost responsibilities. <br />*Do not include ordinary costs involved in head end and microna%e receiver. <br />
The URL can be used to link to this page
Your browser does not support the video tag.