Laserfiche WebLink
APPENUIX U <br />REGIONAL CHANNEL REPORT <br />Report date Janus" 19. 1988 <br />Method of interconnection_ Fiberoutic link to IDS Center from tID with microwave <br />hop from IDS to Mound headcnd site. <br />Time period of study_ _,lanuar <br />Estimated costs $115,000 capital Costs slue $1: S1400/month me apAnp rent <br />Factors Involved In cost <br />Capital Costs: <br />Fiberoptic costa from WCCO to IDS, $25,000 <br />Receiver for Mound Headend, $30,000. Does not include headend coats. <br />Operating Costs, $1200 - $1400/month for fiberoptic link. <br />Technical considerations This method of interconnection ansumes.a line of site <br />from the IDS Center to existing Mound Tower. Loading factors are a consideration <br />for equipment weight, ice and wind. <br />Status: Accepted Rejected Pending Yee <br />If rejected, please give reasons v,hy rejected. <br />If sending, please state next steps to be taken on study and anticipated timellne. <br />1. L..siaeering studies involving a tower loading stress analysis. Teat for <br />en/ln to st nn n,. sn jyst <br />2. Tower height and line of site• <br />,j_. Permitting Prmee-s for in,,, oxtcnn ;f pc,e,hln Pro oosed Resolution. _ <br />Case 184-306, City of Mound, 2/13/84�.n <br />4. Determination of cost responsibilities. <br />*Do not include ordinary costs involved in head end and microna%e receiver. <br />