My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-22-1988 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1988
>
02-22-1988 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:02 AM
Creation date
8/18/2025 10:02:19 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
2/22/1988
Retention Effective Date
8/18/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APPENDIX A <br />DETAILED COST ESTIMATE <br />PART I - STUBBS BAY NORTHWEST <br />S&NITARY <br />SEWER <br />420 <br />Lin ft. <br />8" PVC, 8'-10' deep @ $17.00/lin.ft. <br />7,140.00 <br />630 <br />Lin.ft. <br />8" PVC, 10'-12' deep @ $20.00/lln.ft. <br />12.600.00 <br />445 <br />Li n ft. <br />8" PVC, 12'-14' deep @ $22.00/lla.ft. <br />9,790.00 <br />815 <br />Lin.ft. <br />8" PVC, 14'-16' deep @ $25.00/11n ft. <br />20.375.00 <br />150 <br />Lia.ft. <br />8" PVC, 16'-I8' deep @ $30.00/11n ft. <br />4,500.00 <br />14 <br />Each <br />Manhole @ $1,200.00/each <br />16,800.00 <br />55 <br />Lin.ft. <br />Manhole overdepth @ $100.00/lln.ft. <br />5.500.00 <br />15 <br />Lin.ft. <br />8" DIP, outside drop $50.00/lln.ft. <br />750.00 <br />27 <br />Each <br />Service wye branch @ $50.DO/u. <br />1.350.00 <br />510 <br />Lin.ft. <br />4" CISP service pipe @ $15.00/lin.ft. <br />7,650.00 <br />1,050 <br />Lin ft. <br />4" CISP force main @ $15.00/11n ft. <br />15.750.00 <br />60 <br />Lin.ft. <br />Jack 4" DIP force main 4 using @ $150.00/lin.ft. 9,000.00 <br />L61iP SUM <br />Connect 4" DIP force main to ex. Mk @ <br />$300.00/L.S. 300.00 <br />1 <br />Each <br />Air release manhole @ $2,500.00/ea. <br />2,500.00 <br />1.250 <br />Ton <br />Rock stabilization @ $10.00/ton <br />12.500.00 <br />I <br />Each <br />Lift Station @ $35,000.00/as. <br />35,000.00 <br />$161.505.00 <br />+ 5Z Contingency <br />8,075.00 <br />Subtotal <br />$169,580.00 <br />+ 25% Legal, Eng. 6 Adminis. <br />42,400.00 <br />$211.980.00 <br />- 10 - <br />0-8620b <br />APPENDIX A (CONT'D) <br />RE STC.;AT ION <br />3.000 <br />Cu.yds. <br />Common excavation @ $5.00/cu.yd. <br />15,000.60 <br />3,500 <br />Ton <br />Class 5 (100Z crushed) @ $6.00/ton <br />21,000.00 <br />1,300 <br />Ton <br />2341 bituminous mix @ $25.00/ton <br />32.500.00 <br />70 <br />Ton <br />AC-1 bitualnoua material for nix @ $200.00/ton <br />14.000.00 <br />50 <br />Each <br />Tree removal @ $100.00/es. <br />5,000.DO <br />4,700 <br />Sq.yda. <br />Sod with topsoil @ $2.00/sq.yd. <br />9.400.00 <br />1.0 <br />Acres <br />Seed with topsoil @ $3,000.00/acre <br />3,000.00 <br />$99,900.00 <br />+ 5Z Contingency <br />5,000.00 <br />Subtotal <br />$104.900.00 <br />+ 25% Legal, Eng. 6 Adminis. <br />26,200.00 <br />$131,100.00 <br />0-8620b <br />
The URL can be used to link to this page
Your browser does not support the video tag.