Laserfiche WebLink
Project: Hackberry Park Well, Pump b Pressure System <br />Orono, Minnesota <br />Contractar: E. H. Renner b Sons, Inc. <br />Contract Item <br />BASE BID <br />ITEM NO. 1 - WELL <br />STATEMENT OF WORK <br />Unit <br />Unit Price <br />Payment No: 1 (Revised) <br />File No: 13932 <br />Date: January 26, 1988 <br />Est'd Quantity Amount <br />Quantity To Date To Date <br />Furnish and install a well, pump, <br />pitless adapter tank, electrical <br />controls, all electrical work and <br />related appurtenances, except items <br />listed below, described in the <br />specifications and shown on the <br />plans for the LUMP SUM of <br />L.S. <br />$7,885.00 <br />L.S. <br />Drill open hole for 4" well <br />L.F. <br />6.50 <br />200 <br />4" Well casing including seal <br />L.F. <br />4.50 <br />195 <br />4" Stainless steel. well screen <br />including gravel pack <br />L.F. <br />58.00 <br />5 <br />TOTAL <br />ITEM NO. 1 .............. <br />ITEM NO. 2 - SKATING POND UNDERGROUND <br />PIPING <br />1-1/2" Type K copper w/7' cover <br />1-1/2" curb stop and boa: <br />2" Non -freeze street washer <br />w/concrete base <br />CHANCE ORDER NO. 1 <br />Deduct for changing 2" column pipe <br />to 1-1/2" column pipe <br />7692e <br />i <br />I <br />i <br />L.S. <br />I' <br />I <br />$7,6` 00 <br />, <br />200 <br />1,361.00 <br />195 <br />877.50 <br />5 <br />290.00 <br />*$10,352.50 <br />L.F. $14.00 10 10 $140.00 <br />I <br />Each 190.00 1 1 190.00 <br />l� <br />Ea 585.00 1 1 585.00 i <br />TOTAL ITEM N0. 2 ............... $915.00 <br />L.F. $0.69 126 126-$86.94 <br />Page 1. <br />