My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-12-16 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Deer Run Trail
>
2820 Deer Run Trail - 04-117-23-24-0015
>
Septic
>
1993-12-16 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 3:42:16 PM
Creation date
8/14/2025 3:36:56 PM
Metadata
Fields
Template:
x Address Old
House Number
2820
Street Name
Deer Run
Street Type
Trail
Address
2820 Deer Run Trail
PIN
0411723240015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. If landslope Is 2.9 pciccnt or Ict^ basal width indudes both the <br />upslope and downslope dike widths, <br />Z Calculate minimum mound size based on geometery: <br />a. Determine depdi of dean sand fill at uiMlope edge of rock <br />layen Se/wation /.!_ feet <br />b. Multiply rock layer width by landslope to determine drop <br />in elevation; Slept Difference <br />^ X — %-t»100« — feet <br />c Add depth of dean sand depth of dean sand for <br />separation at upslope edge (2a) to depth of rock layer to <br />rock depth and the depth of cover to find the toul mound <br />height at upslope edge of rock layer; <br />y.7 ft^ lft»lft«3.3 feetSo»^04 <br />d. Enter table on page bottom with landslope and upslope <br />dike ratia Select dike multiplier of H_____. <br />e. Multiply dike multiplier by upslope mound height <br />to get upsiopedike vddth: ~3-3 x ^ = 1*^ feet <br />f. Add die depth of slope difference (2b) to the upslope <br />height to get die downslope height - <br />g. Enter table on page E-18 with landslope and downslope <br />dike ratio. Select dike multiplier of <br />h. Muldply dike multiplier by downslope mound height <br />to get downslope dike width:__- x feet <br />i. Mininmum mound width is the sum of upslope dike <br />width plus roc^ layer widm plus doumslope dj^^^ <br />j. Subtract the Minimum width G.i from the Absorption <br />width F.4 to find the Additional Downslope required for <br />Absorption <br />ft ft. -fwt <br />k. Add the Additional Downslope required for Absorption <br />to the downslope dike width and recalulate the Total "" - - • * <br />Mound Width which is is the sum of upslope dike <br />Vto^>V width plus rock layer width plus downslope dike width ^ ‘ <br />l:t ft4 ;o ft^ ]•! ft = feeti90^-ru I* <br />'Ha' 1. Total mound length is the sum of upslope dike width <br />plus rock layer length plus upslope dike width; <br />_r3 ft*^_LV ft + _/u_fl= HO feet <br />M at <br />dowMIaiw <br />4cl 7:1 kl 4:1 <br />-t^ <br />kl 7:1 M <br />0 la 40 10 10 7.0 10 4.0 10 40 7D 10 <br />I i»417 S34 414 7 51 2«1 }«1 474 144 454 741 <br />3 ji*4J«55.1 4*3 ■ 14 2*5 J-0 4:4 514 4 14 <br />t JA-:45;rt:»7 7;.• •:4"'5 m 5 7.^45 <br />4 ail 47*4Zi :.»i v:2 3m 3 45 417 4M 544 4U4 <br />S 351 SO)447 157 liJ77 341 131 4UU 442 11*$71 <br />4 3i4 124 7.14 «Jt 1307 214 321 IIS 44t 443 541 <br />7 IJO 114 744 1034 1171 241 112 170 421 470 SII•l.tS IM 131 1114 1541 2.43 3!0 157 405 4.4*4J5«4.11 42S *0*1304 1*42 314 2«4 145 140 410 445 <br />43«♦ C :co I5fl0 3131 311 3*4 111 ITS 413 444 <br />n 4U :i4 ::ii 1745 3i:4)3 34 2;*121 1.41 1«5 424 <br />u 444 74*1210 2U1 4171 221 270 113 <br />14*140 4i»
The URL can be used to link to this page
Your browser does not support the video tag.