My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-02-25 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
D
>
Deborah Drive
>
630 Deborah Drive - 31-118-23-22-0008
>
Septic
>
1987-02-25 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 11:24:25 AM
Creation date
8/14/2025 11:19:42 AM
Metadata
Fields
Template:
x Address Old
House Number
630
Street Name
Deborah
Street Type
Drive
Address
630 Deborah Drive
PIN
3111823220008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'-I <br />.H <br />S-P TESTING, INC. <br />951 KATYDID LANE <br />ST. MICHAEL. MN 65376 <br />497-3566 <br />Betz Builders <br />Lot 1# Block 2 <br />McCulley Farm <br />^^Orono/ Henn. Co.» MN. <br />STEVE SHIRMER8 <br />April 21, 1987 <br />G>/2, <br />This system is designed for a Type 1, four bedroom home and in accordance <br />with the Minnesota Pollution Control Agency standards WPC 40 and local <br />ordinances. <br />The sons on this site are typical of SCS soils mapped - KIC2 - Kilkenny <br />loam boardered by LmB Lerdal loam. A seasonally high water table was loca <br />ted at 14", 18", 20" & 26", (mottling). Due to the seasonally high water <br />table, a pressurized mound system will need to be installed. The bottom <br />of the rock bed must be located at least 3’ above the seasonally high <br />water table. <br />The soils at a depth of 18" have a percolation rate averaging 9.7 min/inch <br />and are adequate for treating septic effluent. <br />A pumping chamber will need to be installed to lift the effluent to the <br />mound system. <br />The manifold and supply line pipe must have back drainage to the pumping <br />chamber. The distribution pipes shall have their ends capped. Be sure <br />the rock and sand fill material are clean. The sod layer below the entire <br />mounded area must be turned over, just break up the sod, be sure not to <br />over work. <br />The power supply and switches must be located outside the manhole and pump <br />ing chamber in a weather proof enclosure. A warning device must be in <br />stalled with a light and sound device, this is in case of a pump failure. <br />(Mercury floats are a good method). <br />All neighboring wells are located more than 100' away from the proposed <br />treatment area before and after construction as much as possible. The <br />treatment area should be marked off before construction. <br />With proper installation and maintenance, this system should have no prob <br />lem in treating septic effluent effectively. <br />It is recommended that the septic tanks be pumped every 2 years. <br />Soit and Percotalion Tasti <br />Seplic Sygtam Daiign <br />St <br />Steven B. Schirmers <br />SBS/ds
The URL can be used to link to this page
Your browser does not support the video tag.