My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 1239
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 1200 - 1299 (September 15, 1980 - July 27, 1981)
>
Resolution 1239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 11:58:53 AM
Creation date
11/12/2015 11:58:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� Clt of ORONO <br /> � <br /> � RESOLUTION OF THE CITY COUNCIL <br /> � NO. I��,�� <br /> • - • • <br /> f) A site evaluation was done by Percor, Inc. on 9-6-80 , but <br /> results were not given to the City until December 2, 1980. <br /> This report recommends relocating the entire system because <br /> of high water table in the existing area. Any repair or <br /> expansion to the existing drainfield would be contrary to City <br /> code unless built high with a pumped system, and then may not <br /> work due to the water table and restricted area. • <br /> 50. On September 29 , 1980 , Wisegarver ^told Olson by phone <br /> that he would have the plastic addition removed by November l, 1980 <br /> which statement was entered in the record of the Council Meeting , <br /> that evening. This promise was repeated at the October 14 , 1980 <br /> Council meeting and at a meeting between �9isegarver and Olson on <br /> October 16 , 1980 . <br /> • 51 . On October 16 , 1980 , Wisegarver asked for permits to do some <br /> miscellaneous interior remodeling which he stated was necessary <br /> to accommodate stock from the "plastic greenhouse" so that <br /> structure could be removed. Olson stated that no permits could <br /> be issued without Council approval, but that Olson would poll <br /> the Council and would support issuance of permits if Wisegarver <br /> would supply a plan and data as necessary for a building permit <br /> application. <br /> 52 . ht the October 27 , 1980 Council meeting, authority was given <br /> to the staff to issue building permits for internal remodeling <br /> subject to removal of the greenhouse and repair of the septic <br /> system. <br /> 53 . Olson and Gerhardson inspected the site with Wisegarver <br /> on October 29 , 1980 to review work desired and permits required. <br /> 54 . New building plans were received and reviewed by Olson <br /> on October 30, 1980 . All code deficiencies were noted. A <br /> deadline of .November 10, 1980 was established for greenhouse <br /> removal. A deadline of November 30, 1980 was established for <br /> septic repairs. Wisegarver and his attorney were given copies <br /> of these plan review comments including the deadlines . <br /> : 55 . Building Permit #4386 was issued on November 7, 1980 to <br /> cover interior work already done without permits (including <br /> required double fee penalty) and new work specifically noted <br /> thereon. Other per~iits required were noted thereon to be <br /> mechanical and septic permits. Permit #4386 is signed by <br /> Wisegarver. <br /> Page 10 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.