Laserfiche WebLink
Keep all heavy equipment off of the proposed treatment area before and <br />after construction as much as possible. The treatment area should be <br />marked off before construction. <br />With proper insta:ration and maintenance, this system should have no <br />problem in treating septic effluent -�f�,mctively. <br />Recommend to pump the septic tank every year '_` there is only 1 tank <br />& every 2 years if there are 2 tanks. <br />SLe.�— <br />Stever. B. Schirmer-, ds' <br />SBS/ds <br />