Laserfiche WebLink
1 tp• Does any part of the project area involve: <br />a. shoreland zoning district? No Yes <br />b. delineated 100-year flood plain? No Yes <br />c. state or federally designated river land use district? No Yes <br />If yes, Identify water body and applicable state classification(s), and describe measures <br />to protect water and related land resources: <br />1 9. Describe any physical alteration (-.g., dikes, excavation, fill, stream diversion) of any <br />drainage system, lake, stream, and/or wetland. (Describe measures to minimix ,! Im- <br />pairment of the water -related resources. Estimate quantity of material to be dredged <br />and indicate where spoils will oe deposited. <br />No -physical alteration. Relocation of mor:ring field being done <br />instead of dredging. <br />0. a.Will the project require an appropriation of ground or surface water? If yes, explain <br />(indicate quantity and source): LJ No ❑ Yes <br />b.Will the project affect groundwater levels in any wells (on or off the site)? If yes. ex- <br />plain: [a No ❑ Yes <br />�. Describe the erosion and sedimentation control measures to be used during and after <br />construction of the project. <br />None required <br />r - <br />a. Will the project generate: <br />1. surface and stormwater runoff? No Yes <br />2. sanitary wastewater? No Yes <br />?. industrial wastewater? No Yes <br />4. cooling water (contact and noncontact)? 9No H Yes <br />If yes. Identify sources, volumes, quality (if other than normal domestic sewage), <br />and treatment methods. Give the basis or methodology of estimates. <br />b. !dentify receiving waters, including groundwater, and evaluate the impacts of the <br />discharges listed above. If discharges to groundwater are antic' -tied, provide per- <br />colation/permeability and other hydrogeologicai test data, if a .able. <br />Will the project generate (either during or alter construction): <br />a. air pollution? No Yes <br />b. dust? No Yes <br />c. noise? No Yes <br />d. odors? INO Yes <br />s, explain, including as appropriate: distances to sensitive land uses: expected iev- <br />duration of noise: types end quantities of air pollutants from stacks. mobile <br />Ind fugitive emissions (dusil: odor sources. and mitigative measures for any <br />wive the basis or meihodulugv d estimates. <br />nce project is a relocation, no additional noise or air pallution <br />will be generated. <br />.1 <br />