My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-1989 - Agenda Packet City Council - regular meeting
Orono
>
City Council
>
1989
>
11-13-1989 - Agenda Packet City Council - regular meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:57:01 AM
Creation date
8/4/2025 12:47:19 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet City Council
Section
City Council
Subject
regular meeting
Document Date
11/13/1989
Retention Effective Date
8/4/2025
Retention
Permanent After File Date
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 tp• Does any part of the project area involve: <br />a. shoreland zoning district? No Yes <br />b. delineated 100-year flood plain? No Yes <br />c. state or federally designated river land use district? No Yes <br />If yes, Identify water body and applicable state classification(s), and describe measures <br />to protect water and related land resources: <br />1 9. Describe any physical alteration (-.g., dikes, excavation, fill, stream diversion) of any <br />drainage system, lake, stream, and/or wetland. (Describe measures to minimix ,! Im- <br />pairment of the water -related resources. Estimate quantity of material to be dredged <br />and indicate where spoils will oe deposited. <br />No -physical alteration. Relocation of mor:ring field being done <br />instead of dredging. <br />0. a.Will the project require an appropriation of ground or surface water? If yes, explain <br />(indicate quantity and source): LJ No ❑ Yes <br />b.Will the project affect groundwater levels in any wells (on or off the site)? If yes. ex- <br />plain: [a No ❑ Yes <br />�. Describe the erosion and sedimentation control measures to be used during and after <br />construction of the project. <br />None required <br />r - <br />a. Will the project generate: <br />1. surface and stormwater runoff? No Yes <br />2. sanitary wastewater? No Yes <br />?. industrial wastewater? No Yes <br />4. cooling water (contact and noncontact)? 9No H Yes <br />If yes. Identify sources, volumes, quality (if other than normal domestic sewage), <br />and treatment methods. Give the basis or methodology of estimates. <br />b. !dentify receiving waters, including groundwater, and evaluate the impacts of the <br />discharges listed above. If discharges to groundwater are antic' -tied, provide per- <br />colation/permeability and other hydrogeologicai test data, if a .able. <br />Will the project generate (either during or alter construction): <br />a. air pollution? No Yes <br />b. dust? No Yes <br />c. noise? No Yes <br />d. odors? INO Yes <br />s, explain, including as appropriate: distances to sensitive land uses: expected iev- <br />duration of noise: types end quantities of air pollutants from stacks. mobile <br />Ind fugitive emissions (dusil: odor sources. and mitigative measures for any <br />wive the basis or meihodulugv d estimates. <br />nce project is a relocation, no additional noise or air pallution <br />will be generated. <br />.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.