Laserfiche WebLink
23b. Fug4tive or wind blown dust generated by construct;on will be of a temporary <br />nature and will be controlled by watering. <br />23c. See attached noise study (Exhibit G). <br />25a. The project will be coordinateed with the U.S. Army Corps of Engineers and <br />the Minnesota Department of Natural Resources. If required, necessary <br />wetland mitigation will be pursued. <br />27b. The affected farmlands occur throughout this area, therefore an alignment <br />change would be ineffective to mitigate this situation. <br />CERTIFICATION BY RESPONSIBLE GOVERNMENTAL UNIT <br />I HEREBY CERTIFY THAT THE INFORMATION CONTAINED IN THIS DOCUMENT IS TRUE AND COMPLETE <br />TO THE BEST OF MY KNOWLEDGE AND THAT COPIES OF THE COMPLETE EAW HAVE BEEN MADE <br />AVAILABLE TO ALL POINTS ON THE OFFICIAL EOB DISTRIBUTION LIST. <br />SIGNATURE: �` `` _ DATE: <br />TITLE: Director, Hennepin County Department of Public works <br />-7- <br />