Laserfiche WebLink
On the North Sbore of <br />Lake. lillymetonka <br />ON -SITE SEWAGE TREATMENT CITY <br />INSPECTION REPORT OF POST OFFICE BOX 66 <br />,I ORONO 1335 S. Brown Rd. <br />ilk Crystal Bay, MN 55323 <br />473.7357 <br />�t Lltr�fr_r 301v0 ICi>( ��-ree- L L <br />OWNER ADDRESS <br />PERMITNO.'S. 19125 DATES -14-L_(6 CONTRACTORS <br />City Ordinance No. 210 requires that each on -site sewage treatment system in Orono be inspectet in a . yular bans. Th^ ^n-site sewage <br />treatment system at the aaddress has been inspected and appears to fall into the cateoory checked below. <br />(This is an existing system ❑ new construction) <br />D1 Meets or exceeds current City standards in all respects relating to design, construction, and location. Appears to be operating <br />properly. <br />\T'1 2 Does not meet all current City standards for new construction (1978 Code, but in most respects appears to be designed, <br />located, and constructed generally in accordance with previous codes. System appears to be functioning properly; no major <br />upgradine, of the systt To is required at this time. <br />❑ 3 Does not me,:t current City standards in many respects relating to design, construction, or location. Appears to be operating <br />adequately at this .ime. bt.t has a relatively high potential for future problems. No major upgrading at system is required at <br />this time, <br />4 System mar or may not meet current City standards for design, construction or location, but is fading to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwaters. or is <br />creating a safety hazard, or is otherwise creating a public nuisance. Please contact t.. City Inspector to discuss system repair/ <br />replacement procedures. If drainfield replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION ( [0 Checked items may require your action) <br />Tank inspection indicates: <br />Pumpout not needed at this time. <br />❑ Solids accumulation in tan. , indicates they should be oumo- <br />ad out this year to help prevent future problems. <br />❑ Solids accumulation in tanks is at a crit.cal le- ,I. Tanks <br />should be pumped out as soon as possible. <br />❑ System is discharging to surface. Tanks must be pumped <br />,within 48 hours to eliminate surface discharge. <br />Inspection risers musing—. <br />Inspection risen (4" dia. pipe) must be installed in each tank <br />at next pumpOut. <br />❑ Inspection pipe is located directly over tank baffle. (Does not <br />give accurate measurement of solids accumulation.) If tanks <br />have not been pumped out within the last three years, they <br />should be pumped out ncw. <br />Draifield inspection indicates. <br />Dramfield is dry, no surfacing evident. <br />�❑ Some evidence of surfacing, not critical yet. <br />❑ Dramfield is saturated and visibly discharging untreated <br />effluent to the surface. This cond tion may require replace- <br />ment or additions to drainfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />❑ Dramfield extent and condition unknown. <br />SITE CHARACTERISTICS. <br />Limiting Site Factors Potential for System Failure <br />❑ Slope (depends on soil types, water <br />0 Soil tat le_anc system condition) <br />❑ High water table �eOt-4—Low� ; ys tem u e, <br />❑ Lot size Medium - <br />Lake, tZ!1AA0, or stream ❑ High <br />❑ Drainage ❑ System is causing visible <br />Site Capabilities for <br />Future Expansion <br />❑ Adequate <br />Fair <br />❑ Poor <br />❑ Inadequate <br />su face discharge. <br />COMMENTS <br />kt-Gt� z2, 19 v / <br />—� Date of Inspection eptic System Ins <br />Note: In the event that this inspection report is used to satisfy the requirements for i mortgage or other transfer of <br />this report does not guarantee or certify that an existing system will continue to function properly, but is merely an <br />prootrty, be advised that <br />ooin on of the adequacy <br />of the system under current conditions based on the available information. <br />This report must be kept on the premises with syster.i location and pumping records. <br />WHITE COPY ! Inspector's File GOLD COPY / Homeowner <br />